El Pintado
Sevilla · Andalusia · Guadalquivir
Capacity
215 hm³
Coordinates
37.997°N, 5.948°W
Operator
CHGu
Current fill
95.3%vs 7 days ago
-1.0%losing
vs 1 year ago
-3.8%year-over-year
7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 215 hm³ |
| Usable capacity | 193.5 hm³ |
| Primary use | Multi-purpose |
| Operator | CHGu |
| Province | Sevilla |
| Autonomous community | Andalusia |
| River basin | Guadalquivir |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.997, -5.948 · Open in Google Maps
About El Pintado
As of June 9, 2026, El Pintado is filled to 95.3% of its total capacity, holding roughly 205 hm³ of water out of a maximum 215 hm³. At this level the reservoir is high. Of that total, about 194 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (-1.0 pts), and it is 3.8 points below its level on the same date a year earlier.
Across the readings we hold for El Pintado — 418 data points between June 12, 2018 and June 9, 2026 — the level has ranged from a low of 13.0% (August 22, 2023) to a high of 99.1% (May 20, 2025). On average the reservoir is fullest around April and at its lowest around October.
It is operated by CHGu primarily for multiple purposes. It lies within the Guadalquivir basin at 37.997°N, 5.948°W.
Key facts
- Current fill level
- 95.3%
- Water stored
- 205 hm³
- Total capacity
- 215 hm³
- Usable capacity
- 194 hm³
- 7-day change
- ▼ 1.0 pts
- Year-on-year
- ▼ 3.8 pts
- Primary use
- Multipurpose
- River basin
- Guadalquivir
- Operator
- CHGu
- Coordinates
- 37.997°N, 5.948°W
- Last updated
- June 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Jun 2026 | 95.3% | 205 |
| 2 Jun 2026 | 96.3% | 207 |
| 26 May 2026 | 96.3% | 207 |
| 19 May 2026 | 96.3% | 207 |
| 12 May 2026 | 96.3% | 207 |
| 5 May 2026 | 95.8% | 206 |
| 28 Apr 2026 | 95.8% | 206 |
| 21 Apr 2026 | 95.3% | 205 |
| 14 Apr 2026 | 95.3% | 205 |
| 7 Apr 2026 | 94.9% | 204 |
| 31 Mar 2026 | 94.4% | 203 |
| 24 Mar 2026 | 93.5% | 201 |
Frequently asked questions
What is the current water level of El Pintado?
As of June 9, 2026, El Pintado is at 95.3% of its capacity, holding approximately 205 hm³ of water, according to MITECO data.
Is El Pintado reservoir full?
El Pintado is essentially full, sitting at 95.3% of capacity as of June 9, 2026.
Is the water level at El Pintado rising or falling?
The level at El Pintado has been broadly stable over the latest week on record (-1.0 points).
How much water can El Pintado hold?
El Pintado has a total capacity of 215 hm³, of which about 194 hm³ is usable storage.
Where is El Pintado reservoir located?
El Pintado is located in Sevilla, Andalusia, Spain, within the Guadalquivir basin (coordinates 37.997°N, 5.948°W).
What is El Pintado used for?
El Pintado is used primarily for multiple purposes, and is managed by CHGu.

