reservoirs.earth logo
Reservoirs.EARTH
Extremadura
HighMulti-purpose

Proserpina

Badajoz · Extremadura · Guadiana

Capacity

5 hm³

Coordinates

38.972°N, 6.362°W

Operator

CHSU

80.0% full

Current fill

80.0%
High

vs 7 days ago

0.0%

stable

vs 1 year ago

0.0%

year-over-year

7-day trend

stable

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity5 hm³
Usable capacity4.5 hm³
Primary useMulti-purpose
OperatorCHSU
ProvinceBadajoz
Autonomous communityExtremadura
River basinGuadiana
Data source:embalses.net·Last reading: 2026-09-07

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 38.972, -6.362 · Open in Google Maps

About Proserpina

As of September 7, 2026, Proserpina is filled to 80.0% of its total capacity, holding roughly 4 hm³ of water out of a maximum 5 hm³. At this level the reservoir is high.

Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it sits close to where it was a year earlier.

Across the readings we hold for Proserpina — 419 data points between September 4, 2018 and September 7, 2026 — the level has ranged from a low of 60.0% (September 17, 2019) to a high of 100.0% (December 20, 2022). On average the reservoir is fullest around April and at its lowest around October.

It is operated by CHSU primarily for multiple purposes. It lies within the Guadiana basin at 38.972°N, 6.362°W.

Key facts

Current fill level
80.0%
Water stored
4 hm³
Total capacity
5 hm³
7-day change
No change
Year-on-year
No change
Primary use
Multipurpose
River basin
Guadiana
Operator
CHSU
Coordinates
38.972°N, 6.362°W
Last updated
September 7, 2026

Recent readings

DateFill levelVolume (hm³)
7 Sep 202680.0%4
1 Sep 202680.0%4
25 Aug 202680.0%4
18 Aug 202680.0%4
11 Aug 202680.0%4
4 Aug 2026100.0%5
28 Jul 2026100.0%5
21 Jul 2026100.0%5
14 Jul 2026100.0%5
7 Jul 2026100.0%5
30 Jun 2026100.0%5
23 Jun 2026100.0%5

Nearby reservoirs

ShareXLinkedInWhatsApp