Horno Tejero
Badajoz · Extremadura · Guadiana
Capacity
24 hm³
Coordinates
39.151°N, 6.440°W
Operator
CHSU
58.3% full
Current fill
58.3%vs 7 days ago
0.0%stable
vs 1 year ago
-33.4%year-over-year
7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 24 hm³ |
| Usable capacity | 21.6 hm³ |
| Primary use | Multi-purpose |
| Operator | CHSU |
| Province | Badajoz |
| Autonomous community | Extremadura |
| River basin | Guadiana |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 39.151, -6.440 · Open in Google Maps
About Horno Tejero
As of September 7, 2026, Horno Tejero is filled to 58.3% of its total capacity, holding roughly 14 hm³ of water out of a maximum 24 hm³. At this level the reservoir is within its normal operating range. Of that total, about 22 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it is 33.4 points below its level on the same date a year earlier.
Across the readings we hold for Horno Tejero — 419 data points between September 4, 2018 and September 7, 2026 — the level has ranged from a low of 58.3% (September 1, 2026) to a high of 100.0% (December 20, 2022). On average the reservoir is fullest around April and at its lowest around August.
It is operated by CHSU primarily for multiple purposes. It lies within the Guadiana basin at 39.151°N, 6.440°W.
Key facts
- Current fill level
- 58.3%
- Water stored
- 14 hm³
- Total capacity
- 24 hm³
- Usable capacity
- 22 hm³
- 7-day change
- No change
- Year-on-year
- ▼ 33.4 pts
- Primary use
- Multipurpose
- River basin
- Guadiana
- Operator
- CHSU
- Coordinates
- 39.151°N, 6.440°W
- Last updated
- September 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Sep 2026 | 58.3% | 14 |
| 1 Sep 2026 | 58.3% | 14 |
| 25 Aug 2026 | 62.5% | 15 |
| 18 Aug 2026 | 66.7% | 16 |
| 11 Aug 2026 | 66.7% | 16 |
| 4 Aug 2026 | 70.8% | 17 |
| 28 Jul 2026 | 70.8% | 17 |
| 21 Jul 2026 | 70.8% | 17 |
| 14 Jul 2026 | 75.0% | 18 |
| 7 Jul 2026 | 79.2% | 19 |
| 30 Jun 2026 | 79.2% | 19 |
| 23 Jun 2026 | 83.3% | 20 |

