Cedillo
Cáceres · Extremadura · Tajo
Capacity
260 hm³
Reported
November 2, 2026
90.8% full
Current fill
90.8%vs 27 Oct 2026
-6.1 pplosing
vs 1 year ago
-1.1 ppyear-over-year
Trend
↓falling
Drought context
Spain drought →Storage vs November average
97%of normal
90.8% now · 93.2% average (9 yrs)
Rainfall, last 3 months
Moderately dry
SPI-3 −1.24 · to 21 Oct 2026
EU drought indicator
Warning
Soil-moisture deficit · to 11 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 260 hm³ |
| Primary use | Multi-purpose |
| Operator | CHT |
| River | Tajo - Sever Embalse aguas abajo: No Embalse aguas arriba: Alcántara Salor Tipo de Presa: Arco Gravedad Año de construcción (Final): 1978 Superficie: 1.400,00 ha Localización: Ver Mapa |
| Province | Cáceres |
| Region | Extremadura |
| River basin | Tajo |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 39.657°N, 7.523°W · Open in Google Maps
On the map
Zoom out for the other countries we track · click one to open itLoading map…
About Cedillo
As of November 2, 2026, Cedillo is filled to 90.8% of its total capacity, holding 236 hm³ of water out of a maximum 260 hm³. At this level the reservoir is high.
Since October 27, 2026 the fill level has fallen by 6.1 percentage points, and it is 1.1 points below its level on the same date a year earlier.
Across the readings we hold for Cedillo — 419 data points between October 30, 2018 and November 2, 2026 — the level has ranged from a low of 27.7% (October 8, 2019) to a high of 99.2% (July 20, 2021). On average the reservoir is fullest around May and at its lowest around October.
It is operated by CHT primarily for multiple purposes. It lies within the Tajo basin at 39.657°N, 7.523°W.
Key facts
- Current fill level
- 90.8% of total capacity
- Water stored
- 236 hm³
- Total capacity
- 260 hm³
- Change since October 27, 2026
- ▼ 6.1 pp
- Year-on-year
- ▼ 1.1 pp
- Primary use
- Multipurpose
- River
- Tajo - Sever Embalse aguas abajo: No Embalse aguas arriba: Alcántara Salor Tipo de Presa: Arco Gravedad Año de construcción (Final): 1978 Superficie: 1.400,00 ha Localización: Ver Mapa
- River basin
- Tajo
- Operator
- CHT
- Coordinates
- 39.657°N, 7.523°W
- Last updated
- November 2, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 2 Nov 2026 | 90.8% | 236 |
| 27 Oct 2026 | 96.9% | 252 |
| 20 Oct 2026 | 96.9% | 252 |
| 13 Oct 2026 | 96.5% | 251 |
| 6 Oct 2026 | 97.3% | 253 |
| 29 Sep 2026 | 96.9% | 252 |
| 22 Sep 2026 | 97.3% | 253 |
| 15 Sep 2026 | 96.9% | 252 |
| 8 Sep 2026 | 97.7% | 254 |
| 1 Sep 2026 | 95.4% | 248 |
| 25 Aug 2026 | 95.8% | 249 |
| 18 Aug 2026 | 96.5% | 251 |

