← Extremadura
HighMulti-purpose

Cedillo

Cáceres · Extremadura · Tajo

Capacity

260 hm³

Coordinates

39.657°N, 7.523°W

Operator

CHT

96.9% full

Current fill

96.9%
High

vs 13 Oct 2026

+0.4 pp

gaining

vs 1 year ago

+1.9 pp

year-over-year

Trend

→

stable

Drought context

Storage vs October average

105%of normal

96.9% full on 2026-10-19, against an average of 92.5% for October across 9 years of readings (+4.4 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Cedillo had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.68). Rain, not storage.

EU drought indicator · 11 October 2026

Warningsoil-moisture deficit

The European Drought Observatory's combined reading of rain, soil moisture and vegetation at this point. Watch means rain has been short, Warning that the soil has dried out, Alert that vegetation is visibly stressed; Recovery means the shortfall is easing. Ground conditions, not the reservoir's storage. Spain drought figures →

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity260 hm³
Primary useMulti-purpose
OperatorCHT
ProvinceCáceres
RegionExtremadura
River basinTajo
Data source:embalses.net·Last reading: 2026-10-19

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 39.657°N, 7.523°W · Open in Google Maps

About Cedillo

As of October 19, 2026, Cedillo is filled to 96.9% of its total capacity, holding 252 hm³ of water out of a maximum 260 hm³. At this level the reservoir is high.

Since October 13, 2026 the fill level has held broadly steady (+0.4 pp), and it is 1.9 points above its level on the same date a year earlier.

Across the readings we hold for Cedillo — 419 data points between October 16, 2018 and October 19, 2026 — the level has ranged from a low of 27.7% (October 8, 2019) to a high of 99.2% (July 20, 2021). On average the reservoir is fullest around May and at its lowest around October.

It is operated by CHT primarily for multiple purposes. It lies within the Tajo basin at 39.657°N, 7.523°W.

Key facts

Current fill level
96.9% of total capacity
Water stored
252 hm³
Total capacity
260 hm³
Change since October 13, 2026
▲ 0.4 pp
Year-on-year
▲ 1.9 pp
Primary use
Multipurpose
River basin
Tajo
Operator
CHT
Coordinates
39.657°N, 7.523°W
Last updated
October 19, 2026

Recent readings

DateFill levelVolume (hm³)
19 Oct 202696.9%252
13 Oct 202696.5%251
6 Oct 202697.3%253
29 Sep 202696.9%252
22 Sep 202697.3%253
15 Sep 202696.9%252
8 Sep 202697.7%254
1 Sep 202695.4%248
25 Aug 202695.8%249
18 Aug 202696.5%251
11 Aug 202696.2%250
4 Aug 202695.8%249

Nearby reservoirs