← Extremadura
HighMulti-purpose

Cedillo

Cáceres · Extremadura · Tajo

Capacity

260 hm³

Reported

November 2, 2026

90.8% full

Current fill

90.8%
High

vs 27 Oct 2026

-6.1 pp

losing

vs 1 year ago

-1.1 pp

year-over-year

Trend

↓

falling

Drought context

Spain drought →

Storage vs November average

97%of normal

90.8% now · 93.2% average (9 yrs)

Rainfall, last 3 months

Moderately dry

SPI-3 −1.24 · to 21 Oct 2026

EU drought indicator

Warning

Soil-moisture deficit · to 11 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity260 hm³
Primary useMulti-purpose
OperatorCHT
RiverTajo - Sever Embalse aguas abajo: No Embalse aguas arriba: Alcántara Salor Tipo de Presa: Arco Gravedad Año de construcción (Final): 1978 Superficie: 1.400,00 ha Localización: Ver Mapa
ProvinceCáceres
RegionExtremadura
River basinTajo
Data source:embalses.net·Last reading: 2026-11-02

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 39.657°N, 7.523°W · Open in Google Maps

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

About Cedillo

As of November 2, 2026, Cedillo is filled to 90.8% of its total capacity, holding 236 hm³ of water out of a maximum 260 hm³. At this level the reservoir is high.

Since October 27, 2026 the fill level has fallen by 6.1 percentage points, and it is 1.1 points below its level on the same date a year earlier.

Across the readings we hold for Cedillo — 419 data points between October 30, 2018 and November 2, 2026 — the level has ranged from a low of 27.7% (October 8, 2019) to a high of 99.2% (July 20, 2021). On average the reservoir is fullest around May and at its lowest around October.

It is operated by CHT primarily for multiple purposes. It lies within the Tajo basin at 39.657°N, 7.523°W.

Key facts

Current fill level
90.8% of total capacity
Water stored
236 hm³
Total capacity
260 hm³
Change since October 27, 2026
▼ 6.1 pp
Year-on-year
▼ 1.1 pp
Primary use
Multipurpose
River
Tajo - Sever Embalse aguas abajo: No Embalse aguas arriba: Alcántara Salor Tipo de Presa: Arco Gravedad Año de construcción (Final): 1978 Superficie: 1.400,00 ha Localización: Ver Mapa
River basin
Tajo
Operator
CHT
Coordinates
39.657°N, 7.523°W
Last updated
November 2, 2026

Recent readings

DateFill levelVolume (hm³)
2 Nov 202690.8%236
27 Oct 202696.9%252
20 Oct 202696.9%252
13 Oct 202696.5%251
6 Oct 202697.3%253
29 Sep 202696.9%252
22 Sep 202697.3%253
15 Sep 202696.9%252
8 Sep 202697.7%254
1 Sep 202695.4%248
25 Aug 202695.8%249
18 Aug 202696.5%251

Nearby reservoirs