← Extremadura
NormalMulti-purpose

Borbollón

Cáceres · Extremadura · Tajo

Capacity

88 hm³

Coordinates

40.135°N, 6.557°W

Operator

CHT

42.1% full

Current fill

42.1%
Normal

vs 13 Oct 2026

-1.1 pp

losing

vs 1 year ago

+0.1 pp

year-over-year

Trend

↓

falling

Drought context

Storage vs October average

129%of normal

42.1% full on 2026-10-19, against an average of 32.6% for October across 9 years of readings (+9.5 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Borbollon had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.33). Rain, not storage.

EU drought indicator · 11 October 2026

Noneno drought signal

The European Drought Observatory's combined reading of rain, soil moisture and vegetation at this point. Watch means rain has been short, Warning that the soil has dried out, Alert that vegetation is visibly stressed; Recovery means the shortfall is easing. Ground conditions, not the reservoir's storage. Spain drought figures →

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity88 hm³
Primary useMulti-purpose
OperatorCHT
ProvinceCáceres
RegionExtremadura
River basinTajo
Data source:embalses.net·Last reading: 2026-10-19

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 40.135°N, 6.557°W · Open in Google Maps

About Borbollón

As of October 19, 2026, Borbollón is filled to 42.1% of its total capacity, holding 37 hm³ of water out of a maximum 88 hm³. At this level the reservoir is within its normal operating range.

Since October 13, 2026 the fill level has fallen by 1.1 percentage points, and it sits close to where it was a year earlier.

Across the readings we hold for Borbollón — 419 data points between October 16, 2018 and October 19, 2026 — the level has ranged from a low of 15.9% (October 18, 2022) to a high of 92.0% (May 19, 2020). On average the reservoir is fullest around April and at its lowest around October.

It is operated by CHT primarily for multiple purposes. It lies within the Tajo basin at 40.135°N, 6.557°W.

Key facts

Current fill level
42.1% of total capacity
Water stored
37 hm³
Total capacity
88 hm³
Change since October 13, 2026
▼ 1.1 pp
Year-on-year
▲ 0.1 pp
Primary use
Multipurpose
River basin
Tajo
Operator
CHT
Coordinates
40.135°N, 6.557°W
Last updated
October 19, 2026

Recent readings

DateFill levelVolume (hm³)
19 Oct 202642.1%37
13 Oct 202643.2%38
6 Oct 202643.2%38
29 Sep 202643.2%38
22 Sep 202644.3%39
15 Sep 202645.5%40
8 Sep 202646.6%41
1 Sep 202647.7%42
25 Aug 202647.7%42
18 Aug 202650.0%44
11 Aug 202652.3%46
4 Aug 202654.5%48

Nearby reservoirs