Bárcena
León · Castile and León · Miño - Sil
Capacity
341 hm³
Coordinates
42.612°N, 6.541°W
Operator
CHS
77.7% full
Current fill
77.7%vs 7 days ago
-1.2%losing
vs 1 year ago
-15.0%year-over-year
7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 341 hm³ |
| Usable capacity | 306.9 hm³ |
| Primary use | Multi-purpose |
| Operator | CHS |
| Province | León |
| Autonomous community | Castile and León |
| River basin | Miño - Sil |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 42.612, -6.541 · Open in Google Maps
About Bárcena
As of September 7, 2026, Bárcena is filled to 77.7% of its total capacity, holding roughly 265 hm³ of water out of a maximum 341 hm³. At this level the reservoir is within its normal operating range. Of that total, about 307 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (-1.2 pts), and it is 15.0 points below its level on the same date a year earlier.
Across the readings we hold for Bárcena — 419 data points between September 4, 2018 and September 7, 2026 — the level has ranged from a low of 25.5% (December 18, 2018) to a high of 97.9% (May 21, 2024). On average the reservoir is fullest around June and at its lowest around November.
It is operated by CHS primarily for multiple purposes. It lies within the Miño - Sil basin at 42.612°N, 6.541°W.
Key facts
- Current fill level
- 77.7%
- Water stored
- 265 hm³
- Total capacity
- 341 hm³
- Usable capacity
- 307 hm³
- 7-day change
- ▼ 1.2 pts
- Year-on-year
- ▼ 15.0 pts
- Primary use
- Multipurpose
- River basin
- Miño - Sil
- Operator
- CHS
- Coordinates
- 42.612°N, 6.541°W
- Last updated
- September 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Sep 2026 | 77.7% | 265 |
| 1 Sep 2026 | 78.9% | 269 |
| 25 Aug 2026 | 80.1% | 273 |
| 18 Aug 2026 | 81.2% | 277 |
| 11 Aug 2026 | 81.2% | 277 |
| 4 Aug 2026 | 82.1% | 280 |
| 28 Jul 2026 | 83.0% | 283 |
| 21 Jul 2026 | 86.5% | 295 |
| 14 Jul 2026 | 89.7% | 306 |
| 7 Jul 2026 | 91.8% | 313 |
| 30 Jun 2026 | 92.1% | 314 |
| 23 Jun 2026 | 93.0% | 317 |

