Santa Eulalia
Ourense · Galicia · Miño - Sil
Capacity
10 hm³
Reported
November 2, 2026
60.0% full
Current fill
60.0%vs 27 Oct 2026
-10.0 pplosing
vs 1 year ago
-20.0 ppyear-over-year
Trend
↓falling
Drought context
Spain drought →Storage vs November average
79%of normal
60.0% now · 76.1% average (9 yrs)
Rainfall, last 3 months
Near normal
SPI-3 −0.96 · to 11 Oct 2026
EU drought indicator
None
No drought signal · to 11 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 10 hm³ |
| Primary use | Multi-purpose |
| Operator | CHS |
| River | Jares Embalse aguas abajo: Montefurado Embalse aguas arriba: Prada Tipo de Presa: Bóveda Año de construcción (Final): 1966 Superficie: 41,00 ha Localización: Ver Mapa |
| Province | Ourense |
| Region | Galicia |
| River basin | Miño - Sil |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 42.346°N, 7.056°W · Open in Google Maps
On the map
Zoom out for the other countries we track · click one to open itLoading map…
About Santa Eulalia
As of November 2, 2026, Santa Eulalia is filled to 60.0% of its total capacity, holding 6 hm³ of water out of a maximum 10 hm³. At this level the reservoir is within its normal operating range.
Since October 27, 2026 the fill level has fallen by 10.0 percentage points, and it is 20.0 points below its level on the same date a year earlier.
Across the readings we hold for Santa Eulalia — 419 data points between October 30, 2018 and November 2, 2026 — the level has ranged from a low of 40.0% (July 2, 2019) to a high of 100.0% (February 12, 2019). On average the reservoir is fullest around April and at its lowest around July.
It is operated by CHS primarily for multiple purposes. It lies within the Miño - Sil basin at 42.346°N, 7.056°W.
Key facts
- Current fill level
- 60.0% of total capacity
- Water stored
- 6 hm³
- Total capacity
- 10 hm³
- Change since October 27, 2026
- ▼ 10.0 pp
- Year-on-year
- ▼ 20.0 pp
- Primary use
- Multipurpose
- River
- Jares Embalse aguas abajo: Montefurado Embalse aguas arriba: Prada Tipo de Presa: Bóveda Año de construcción (Final): 1966 Superficie: 41,00 ha Localización: Ver Mapa
- River basin
- Miño - Sil
- Operator
- CHS
- Coordinates
- 42.346°N, 7.056°W
- Last updated
- November 2, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 2 Nov 2026 | 60.0% | 6 |
| 27 Oct 2026 | 70.0% | 7 |
| 20 Oct 2026 | 80.0% | 8 |
| 13 Oct 2026 | 80.0% | 8 |
| 6 Oct 2026 | 60.0% | 6 |
| 29 Sep 2026 | 80.0% | 8 |
| 22 Sep 2026 | 70.0% | 7 |
| 15 Sep 2026 | 60.0% | 6 |
| 8 Sep 2026 | 50.0% | 5 |
| 1 Sep 2026 | 60.0% | 6 |
| 25 Aug 2026 | 60.0% | 6 |
| 18 Aug 2026 | 50.0% | 5 |