Mangla Dam
Azad Jammu & Kashmir · Jhelum
Live capacity
9,111.7 hm³
Coordinates
33.127°N, 73.650°E
Operator
WAPDA
54.6% full
Current fill
54.6%vs 7 days ago
-1.2 pplosing
vs 1 year ago
N/A7-day trend
↓falling
Drought context
Rain over the last three months · 11 October 2026
Near normal
In the three months to 11 October 2026 the area around Mangla Dam had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.74). Rain, not storage. Pakistan drought figures →
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Gross capacity | 10,345.2 hm³ |
| Live capacity | 9,111.7 hm³ |
| Dam height | 138 m |
| Dam type | Embankment |
| Year built | 1967 |
| Primary use | Hydroelectric |
| Operator | WAPDA |
| Province | Azad Jammu & Kashmir |
| River basin | Jhelum |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 33.127°N, 73.650°E · Open in Google Maps
About Mangla Dam
As of October 27, 2026, Mangla Dam is at 54.6% of useful capacity, holding 4,972 hm³ of 9,112 hm³. That live volume plus 1,234 hm³ of dead storage is 60.0% of the 10,345 hm³ total capacity. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has fallen by 1.2 percentage points.
Across the readings we hold for Mangla Dam — 162 data points between May 18, 2026 and October 27, 2026 — the level has ranged from a low of 30.4% (June 30, 2026) to a high of 77.9% (September 8, 2026). On average the reservoir is fullest around September and at its lowest around May.
The dam at Mangla Dam stands 138 m tall and is a embankment dam and was completed in 1967. It is operated by WAPDA primarily for hydroelectric power. It lies within the Jhelum basin at 33.127°N, 73.650°E.
Mangla storage is WAPDA's daily usable storage, the live water above the 1,050 ft minimum operating level. WAPDA does not publish a machine-readable feed, and the IRSA daily PDF gives the water level only. Where a day's WAPDA usable figure was published, that figure is stored. Every other day uses the IRSA level, which matches the WAPDA level on the days both exist, read through a piecewise-linear curve fitted to the 2026 WAPDA level and usable-storage pairs so those pairs are reproduced. The five-point gross curve minus 1.000 million acre-feet is not used; it sat about 0.35 million acre-feet below the WAPDA figures. Fill is the usable volume divided by the 7.387 million acre-foot live capacity in Flood Forecasting Division bulletin 124/26 of 15 October 2026. That bulletin and the WAPDA wire the same day both give 4.169 million acre-feet at 1,198.95 ft. The bulletin prints 57.29% beside that pair; 4.169 divided by 7.387 is 56.4%, which is the figure stored. The 24 and 25 October readings are the APP wires reprinted by UrduPoint, because the IRSA files for those days were not available: 1,197.50 ft and 4.082 million acre-feet (https://www.urdupoint.com/daily/livenews/2026-10-24/news-4986065.html), then 1,197.20 ft and 4.064 million acre-feet (https://www.urdupoint.com/daily/livenews/2026-10-25/news-4987139.html). Levels from 1,220.45 ft up to the 8 September peak of 1,222.35 ft are above the highest published pair, so those ten days continue the slope of the 1, 2 and 13 September pairs. Tarbela and Chashma use the same usable-storage basis. Their curves are fitted to the WAPDA wires, not to the old gross elevation curves.
Key facts
- Current fill level
- 54.6% of useful capacity
- Water stored
- 4,972 hm³
- Total capacity
- 10,345 hm³
- Usable capacity
- 9,112 hm³
- 7-day change
- ▼ 1.2 pp
- Primary use
- Hydroelectric power
- River basin
- Jhelum
- Dam height
- 138 m
- Year completed
- 1967
- Operator
- WAPDA
- Coordinates
- 33.127°N, 73.650°E
- Last updated
- October 27, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 27 Oct 2026 | 54.6% | 4,972 |
| 26 Oct 2026 | 54.8% | 4,991 |
| 25 Oct 2026 | 55.0% | 5,013 |
| 24 Oct 2026 | 55.3% | 5,035 |
| 23 Oct 2026 | 55.5% | 5,054 |
| 22 Oct 2026 | 55.6% | 5,068 |
| 21 Oct 2026 | 55.7% | 5,076 |
| 20 Oct 2026 | 55.8% | 5,083 |
| 19 Oct 2026 | 55.9% | 5,091 |
| 18 Oct 2026 | 55.9% | 5,098 |
| 17 Oct 2026 | 56.1% | 5,109 |
| 16 Oct 2026 | 56.2% | 5,120 |