← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Varadarajaswamy Gudi Project

5.4% of gross capacity

Gross capacity

0.39 TMC (11.015 MCM)

Live capacity

0.39 TMC (11.015 MCM)

Basin

Krishna

Operator

AP Water Resources Dept

Coordinates

15.967°N, 78.646°E

Last updated

2026-10-28

Capacity in TMC

Varadarajaswamy Gudi Project Dam has a gross capacity of 0.39 TMC (11.015 MCM); it is currently at 5.4% of gross capacity, holding 0.02 TMC (0.595 MCM).

Gross capacity
0.39 TMC (11.015 MCM)
Live capacity
0.39 TMC (11.015 MCM)
Current storage
0.02 TMC (0.595 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

5.4%
Critical

vs 22 Oct 2026

0.0 pp

stable

vs 1 year ago

N/A

Trend

→

stable

Drought context

Rain over the last three months · 11 October 2026

Extremely dry

In the three months to 11 October 2026 the area around Varadarajaswamy Gudi Project had extremely little rain for the season, a shortfall seen about one year in forty. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −2.06). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 15.967°N, 78.646°E · Open in Google Maps

About Varadarajaswamy Gudi Project

As of October 28, 2026, Varadarajaswamy Gudi Project is filled to 5.4% of its gross capacity, holding 0.02 TMC (0.595 MCM) of a gross 0.39 TMC (11.015 MCM). At this level the reservoir is critically low.

Since October 22, 2026 the fill level has held broadly steady (+0.0 pp).

Across the readings we hold for Varadarajaswamy Gudi Project — 14 data points between July 2, 2026 and October 28, 2026 — the level has ranged from a low of 5.4% (October 22, 2026) to a high of 7.1% (July 2, 2026).

It is operated by AP Water Resources Dept. It lies within the Krishna basin at 15.967°N, 78.646°E.

Key facts

Current fill level
5.4% of total capacity
Water stored
0.02 TMC (0.595 MCM)
Total capacity
0.39 TMC (11.015 MCM)
Change since October 22, 2026
No change
River basin
Krishna
Operator
AP Water Resources Dept
Coordinates
15.967°N, 78.646°E
Last updated
October 28, 2026

Recent readings

DateFill levelVolume (hm³)
28 Oct 20265.4%0.595
27 Oct 20265.4%1
22 Oct 20265.4%1
16 Sep 20266.2%1
9 Sep 20266.4%1
2 Sep 20266.4%1
27 Aug 20266.9%1
20 Aug 20267.1%1
13 Aug 20267.1%1
4 Aug 20267.1%1
29 Jul 20267.1%1
22 Jul 20267.1%1

Nearby reservoirs