Reservoir · Andhra Pradesh · India · CWC
Varadarajaswamy Gudi Project
7.3% full
Total capacity
11 hm³
Live storage
11 hm³
River
Krishna
Basin
Krishna
Operator
AP Water Resources Dept
Coordinates
15.967°N, 78.646°E
Last updated
2026-06-09
Current fill
7.3%vs 7 days ago
0.0%stable
vs 1 year ago
N/A7-day trend
→stable
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 15.967, 78.646 · Open in Google Maps
About Varadarajaswamy Gudi Project
As of June 9, 2026, Varadarajaswamy Gudi Project is filled to 7.3% of its total capacity, holding roughly 1 hm³ of water out of a maximum 11 hm³. At this level the reservoir is critically low.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts).
Across the readings we hold for Varadarajaswamy Gudi Project — 1 data points between June 9, 2026 and June 9, 2026 — the level has ranged from a low of 7.3% (June 9, 2026) to a high of 7.3% (June 9, 2026).
It is operated by AP Water Resources Dept. It lies within the Krishna basin at 15.967°N, 78.646°E.
Key facts
- Current fill level
- 7.3%
- Water stored
- 1 hm³
- Total capacity
- 11 hm³
- 7-day change
- No change
- River
- Krishna
- River basin
- Krishna
- Operator
- AP Water Resources Dept
- Coordinates
- 15.967°N, 78.646°E
- Last updated
- June 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Jun 2026 | 7.3% | 1 |
Frequently asked questions
What is the current water level of Varadarajaswamy Gudi Project?
As of June 9, 2026, Varadarajaswamy Gudi Project is at 7.3% of its capacity, holding approximately 1 hm³ of water, according to AP-WRIMS data.
Is Varadarajaswamy Gudi Project reservoir full?
No. As of June 9, 2026, Varadarajaswamy Gudi Project is critically low at 7.3% of its capacity, so it is not full.
Is the water level at Varadarajaswamy Gudi Project rising or falling?
The level at Varadarajaswamy Gudi Project has been broadly stable over the latest week on record (0.0 points).
How much water can Varadarajaswamy Gudi Project hold?
Varadarajaswamy Gudi Project has a total capacity of 11 hm³.
Where is Varadarajaswamy Gudi Project reservoir located?
Varadarajaswamy Gudi Project is located in Andhra Pradesh, India, within the Krishna basin (coordinates 15.967°N, 78.646°E).

