Reservoir · Andhra Pradesh · India · AP-WRIMS
Gorakkalu Balancing Reservior
79.1% of gross capacity
Gross capacity
11.0 TMC (311.485 MCM)
Live capacity
8.8 TMC (250.604 MCM)
Basin
Pennar
Reported
November 5, 2026
Capacity in TMC
Gorakkalu Balancing Reservior Dam has a gross capacity of 11.0 TMC (311.485 MCM), of which 8.8 TMC (250.604 MCM) is live storage; it is currently at 79.1% of gross capacity, holding 8.7 TMC (246.469 MCM) (98.3% of live capacity).
- Gross capacity
- 11.0 TMC (311.485 MCM)
- Live capacity
- 8.8 TMC (250.604 MCM)
- Current storage
- 8.7 TMC (246.469 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
79.1%vs 7 days ago
-2.7 pplosing
vs 1 year ago
N/A7-day trend
↓falling
Drought context
India drought →Rainfall, last 3 months
Extremely dry
SPI-3 −2.02 · to 11 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: AP-WRIMS.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 15.564°N, 78.401°E · Open in Google Maps
On the map
Zoom out for the other countries we track · click one to open itLoading map…
About Gorakkalu Balancing Reservior
As of November 5, 2026, Gorakkalu Balancing Reservior is filled to 79.1% of its gross capacity, holding 8.7 TMC (246.469 MCM) of a gross 11.0 TMC (311.485 MCM). At this level the reservoir is within its normal operating range. Of that total, 8.8 TMC (250.604 MCM) is live storage.
Over the most recent week on record the fill level has fallen by 2.7 percentage points.
Across the readings we hold for Gorakkalu Balancing Reservior — 19 data points between July 2, 2026 and November 5, 2026 — the level has ranged from a low of 22.6% (August 4, 2026) to a high of 84.7% (September 16, 2026).
It is operated by AP Water Resources Dept. It lies within the Pennar basin at 15.564°N, 78.401°E.
Key facts
- Current fill level
- 79.1% of total capacity
- Water stored
- 8.7 TMC (246.469 MCM)
- Total capacity
- 11.0 TMC (311.485 MCM)
- Usable capacity
- 8.8 TMC (250.604 MCM)
- 7-day change
- ▼ 2.7 pp
- River basin
- Pennar
- Operator
- AP Water Resources Dept
- Coordinates
- 15.564°N, 78.401°E
- Last updated
- November 5, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 5 Nov 2026 | 79.1% | 246.469 |
| 4 Nov 2026 | 79.5% | 247.489 |
| 3 Nov 2026 | 80.1% | 249.471 |
| 2 Nov 2026 | 80.2% | 249.782 |
| 29 Oct 2026 | 81.8% | 254.851 |
| 28 Oct 2026 | 82.1% | 255.701 |
| 27 Oct 2026 | 82.3% | 256 |
| 22 Oct 2026 | 83.8% | 261 |
| 16 Sep 2026 | 84.7% | 264 |
| 9 Sep 2026 | 71.2% | 222 |
| 2 Sep 2026 | 72.7% | 226 |
| 27 Aug 2026 | 70.3% | 219 |

