Reservoir · Gujarat · India · CWC · UNKNOWN region
Shetrunji
Shetrunji Dam
100.0% full
Gross capacity
28.3 TMC (802 MCM)
Live capacity
24.8 TMC (703 MCM)
River
Shetrunji
Basin
West Flowing
Primary use
irrigation
Operator
GUJARAT
Coordinates
21.583°N, 71.833°E
Last updated
2026-10-22
Capacity in TMC
Shetrunji Dam has a gross capacity of 28.3 TMC (802 MCM), of which 24.8 TMC (703 MCM) is live storage; it is currently at 100% full, holding 10.6 TMC (300 MCM).
- Gross capacity
- 28.3 TMC (802 MCM)
- Live capacity
- 24.8 TMC (703 MCM)
- Current storage
- 10.6 TMC (300 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
100.0%vs 7 days ago
0.0 ppstable
vs 1 year ago
0.0 ppyear-over-year
7-day trend
→stable
Drought context
Storage vs October average
100%of normal
100.0% full on 2026-10-22, against an average of 100.0% for October across 4 years of readings (0.0 points).
Rain over the last three months · 11 October 2026
Near normal
In the three months to 11 October 2026 the area around Shetrunji had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.36). Rain, not storage. India drought figures →
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC. CWC region: UNKNOWN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 21.583°N, 71.833°E · Open in Google Maps
About Shetrunji Dam
As of October 22, 2026, Shetrunji Dam has a published fill of 100.0%, holding 10.6 TMC (300 MCM). Gross capacity is 28.3 TMC (802 MCM). At this level the reservoir is high. Of that total, 24.8 TMC (703 MCM) is live storage.
Over the most recent week on record the fill level has held broadly steady (+0.0 pp), and it sits close to where it was a year earlier.
Across the readings we hold for Shetrunji Dam — 171 data points between June 8, 2023 and October 22, 2026 — the level has ranged from a low of 18.0% (June 6, 2024) to a high of 100.0% (July 20, 2023). On average the reservoir is fullest around October and at its lowest around May.
It is operated by GUJARAT primarily for irrigation. It lies within the West Flowing basin at 21.583°N, 71.833°E.
Key facts
- Current fill level
- 100.0%
- Water stored
- 10.6 TMC (300 MCM)
- Total capacity
- 28.3 TMC (802 MCM)
- Usable capacity
- 24.8 TMC (703 MCM)
- 7-day change
- No change
- Year-on-year
- No change
- Primary use
- Irrigation
- River
- Shetrunji
- River basin
- West Flowing
- Operator
- GUJARAT
- Coordinates
- 21.583°N, 71.833°E
- Last updated
- October 22, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 22 Oct 2026 | 100.0% | 300 |
| 15 Oct 2026 | 100.0% | 300 |
| 8 Oct 2026 | 100.0% | 300 |
| 1 Oct 2026 | 100.0% | 300 |
| 24 Sep 2026 | 100.0% | 300 |
| 17 Sep 2026 | 100.0% | 300 |
| 10 Sep 2026 | 100.0% | 300 |
| 3 Sep 2026 | 100.0% | 300 |
| 27 Aug 2026 | 100.0% | 300 |
| 20 Aug 2026 | 100.0% | 300 |
| 13 Aug 2026 | 100.0% | 300 |
| 6 Aug 2026 | 100.0% | 300 |

