← Gujarat

Reservoir · Gujarat · India · CWC · UNKNOWN region

Shetrunji

Shetrunji Dam

100.0% full

Gross capacity

28.3 TMC (802 MCM)

Live capacity

24.8 TMC (703 MCM)

River

Shetrunji

Basin

West Flowing

Primary use

irrigation

Operator

GUJARAT

Coordinates

21.583°N, 71.833°E

Last updated

2026-10-22

Capacity in TMC

Shetrunji Dam has a gross capacity of 28.3 TMC (802 MCM), of which 24.8 TMC (703 MCM) is live storage; it is currently at 100% full, holding 10.6 TMC (300 MCM).

Gross capacity
28.3 TMC (802 MCM)
Live capacity
24.8 TMC (703 MCM)
Current storage
10.6 TMC (300 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

100.0%
High

vs 7 days ago

0.0 pp

stable

vs 1 year ago

0.0 pp

year-over-year

7-day trend

→

stable

Drought context

Storage vs October average

100%of normal

100.0% full on 2026-10-22, against an average of 100.0% for October across 4 years of readings (0.0 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Shetrunji had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.36). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC. CWC region: UNKNOWN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 21.583°N, 71.833°E · Open in Google Maps

About Shetrunji Dam

As of October 22, 2026, Shetrunji Dam has a published fill of 100.0%, holding 10.6 TMC (300 MCM). Gross capacity is 28.3 TMC (802 MCM). At this level the reservoir is high. Of that total, 24.8 TMC (703 MCM) is live storage.

Over the most recent week on record the fill level has held broadly steady (+0.0 pp), and it sits close to where it was a year earlier.

Across the readings we hold for Shetrunji Dam — 171 data points between June 8, 2023 and October 22, 2026 — the level has ranged from a low of 18.0% (June 6, 2024) to a high of 100.0% (July 20, 2023). On average the reservoir is fullest around October and at its lowest around May.

It is operated by GUJARAT primarily for irrigation. It lies within the West Flowing basin at 21.583°N, 71.833°E.

Key facts

Current fill level
100.0%
Water stored
10.6 TMC (300 MCM)
Total capacity
28.3 TMC (802 MCM)
Usable capacity
24.8 TMC (703 MCM)
7-day change
No change
Year-on-year
No change
Primary use
Irrigation
River
Shetrunji
River basin
West Flowing
Operator
GUJARAT
Coordinates
21.583°N, 71.833°E
Last updated
October 22, 2026

Recent readings

DateFill levelVolume (hm³)
22 Oct 2026100.0%300
15 Oct 2026100.0%300
8 Oct 2026100.0%300
1 Oct 2026100.0%300
24 Sep 2026100.0%300
17 Sep 2026100.0%300
10 Sep 2026100.0%300
3 Sep 2026100.0%300
27 Aug 2026100.0%300
20 Aug 2026100.0%300
13 Aug 2026100.0%300
6 Aug 2026100.0%300

Nearby reservoirs