Reservoir · Gujarat · India · CWC · UNKNOWN region
Machhu-2
Machhu Dam II
91.8% full
Total capacity
91 hm³
Live storage
91 hm³
River
Machhu
Basin
West Flowing
Primary use
irrigation
Operator
GUJARAT
Coordinates
22.763°N, 70.865°E
Last updated
2026-07-30
Current fill
91.8%vs 7 days ago
+58.0%gaining
vs 1 year ago
+61.1%year-over-year
7-day trend
↑rising
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: UNKNOWN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 22.763, 70.865 · Open in Google Maps
About Machhu Dam II
As of July 30, 2026, Machhu Dam II is filled to 91.8% of its total capacity, holding roughly 84 hm³ of water out of a maximum 91 hm³. At this level the reservoir is high.
Over the most recent week on record the fill level has risen by 58.0 percentage points, and it is 61.1 points above its level on the same date a year earlier.
Across the readings we hold for Machhu Dam II — 160 data points between June 8, 2023 and July 30, 2026 — the level has ranged from a low of 0.0% (May 22, 2025) to a high of 92.4% (December 4, 2025). On average the reservoir is fullest around October and at its lowest around June.
It is operated by GUJARAT primarily for irrigation. It lies within the West Flowing basin at 22.763°N, 70.865°E.
Key facts
- Current fill level
- 91.8%
- Water stored
- 84 hm³
- Total capacity
- 91 hm³
- 7-day change
- ▲ 58.0 pts
- Year-on-year
- ▲ 61.1 pts
- Primary use
- Irrigation
- River
- Machhu
- River basin
- West Flowing
- Operator
- GUJARAT
- Coordinates
- 22.763°N, 70.865°E
- Last updated
- July 30, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 30 Jul 2026 | 91.8% | 84 |
| 23 Jul 2026 | 33.9% | 31 |
| 16 Jul 2026 | 27.6% | 25 |
| 9 Jul 2026 | 25.0% | 23 |
| 2 Jul 2026 | 17.3% | 16 |
| 25 Jun 2026 | 19.3% | 18 |
| 4 Jun 2026 | 31.5% | 29 |
| 31 May 2026 | 8.0% | 6,000 |
| 29 May 2026 | 36.3% | 33 |
| 21 May 2026 | 39.1% | 36 |
| 14 May 2026 | 41.8% | 38 |
| 7 May 2026 | 44.2% | 40 |
Frequently asked questions
What is the current water level of Machhu Dam II?
As of July 30, 2026, Machhu Dam II is at 91.8% of its capacity, holding approximately 84 hm³ of water, according to CWC data.
Is Machhu Dam II reservoir full?
No. As of July 30, 2026, Machhu Dam II is high at 91.8% of its capacity, so it is not full.
Is the water level at Machhu Dam II rising or falling?
The level at Machhu Dam II is rising — it gained 58.0 percentage points over the latest week on record.
How much water can Machhu Dam II hold?
Machhu Dam II has a total capacity of 91 hm³.
Where is Machhu Dam II reservoir located?
Machhu Dam II is located in Gujarat, India, within the West Flowing basin (coordinates 22.763°N, 70.865°E).
What is Machhu Dam II used for?
Machhu Dam II is used primarily for irrigation, and is managed by GUJARAT.

