← Gujarat

Reservoir · Gujarat · India · CWC · UNKNOWN region

Sardar Sarovar (SSP)

Sardar Sarovar Dam

99.4% of live capacity

Gross capacity

334.1 TMC (9,460 MCM)

Live capacity

204.8 TMC (5,800 MCM)

Basin

Narmada

Primary use

multiple

Operator

SSNNL

Coordinates

21.831°N, 73.742°E

Last updated

2026-10-22

Capacity in TMC

Sardar Sarovar (SSP) Dam has a gross capacity of 334.1 TMC (9,460 MCM), of which 204.8 TMC (5,800 MCM) is live storage; it is currently at 99.4% of live capacity, holding 202.3 TMC (5,728 MCM).

Gross capacity
334.1 TMC (9,460 MCM)
Live capacity
204.8 TMC (5,800 MCM)
Current storage
202.3 TMC (5,728 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

99.4%
High

vs 7 days ago

-0.1 pp

losing

vs 1 year ago

+1.8 pp

year-over-year

7-day trend

→

stable

Drought context

Storage vs October average

100%of normal

99.4% full on 2026-10-22, against an average of 99.0% for October across 4 years of readings (+0.4 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Sardar Sarovar (SSP) had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index +0.15). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC. CWC region: UNKNOWN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 21.831°N, 73.742°E · Open in Google Maps

About Sardar Sarovar Dam

As of October 22, 2026, Sardar Sarovar Dam is at 99.4% of useful capacity, holding 202.3 TMC (5,728 MCM) of 204.8 TMC (5,800 MCM). Of the gross 334.1 TMC (9,460 MCM), that is 60.5%. At this level the reservoir is high.

Over the most recent week on record the fill level has held broadly steady (-0.1 pp), and it is 1.8 points above its level on the same date a year earlier.

Across the readings we hold for Sardar Sarovar Dam — 170 data points between June 8, 2023 and October 22, 2026 — the level has ranged from a low of 12.9% (July 3, 2025) to a high of 100.0% (September 21, 2023). On average the reservoir is fullest around October and at its lowest around June.

It is operated by SSNNL primarily for multiple purposes. It lies within the Narmada basin at 21.831°N, 73.742°E.

Key facts

Current fill level
99.4% of useful capacity
Water stored
202.3 TMC (5,728 MCM)
Total capacity
334.1 TMC (9,460 MCM)
Usable capacity
204.8 TMC (5,800 MCM)
7-day change
▼ 0.1 pp
Year-on-year
▲ 1.8 pp
Primary use
Multipurpose
River basin
Narmada
Operator
SSNNL
Coordinates
21.831°N, 73.742°E
Last updated
October 22, 2026

Recent readings

DateFill levelVolume (hm³)
22 Oct 202699.4%5,728
15 Oct 202699.5%5,734
8 Oct 202699.1%5,708
1 Oct 202699.9%5,754
24 Sep 202698.8%5,689
17 Sep 202693.3%5,377
10 Sep 202687.6%5,048
3 Sep 202681.8%4,710
27 Aug 202676.5%4,403
20 Aug 202679.5%4,577
13 Aug 202677.2%4,447
6 Aug 202667.7%3,898

Nearby reservoirs