reservoirs.earth logo
Reservoirs.EARTH
← Gujarat

Reservoir · Gujarat · India · CWC · UNKNOWN region

Damanganga (Madhuban)

Damanganga Dam

93.7% full

Gross capacity

21.7 TMC (615 MCM)

Live capacity

19.5 TMC (551 MCM)

River

Damanganga

Basin

West Flowing

Primary use

irrigation

Operator

GJ/MH

Coordinates

20.517°N, 73.567°E

Last updated

2026-09-24

Capacity in TMC

Damanganga (Madhuban) Dam has a gross capacity of 21.7 TMC (615 MCM), of which 19.5 TMC (551 MCM) is live storage; it is currently at 94% full, holding 16.6 TMC (470 MCM).

Gross capacity
21.7 TMC (615 MCM)
Live capacity
19.5 TMC (551 MCM)
Current storage
16.6 TMC (470 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

⏳Data older than 14 days — last reading 2026-09-24. Shown for reference; it may not reflect current levels.

Current fill

93.7%
High

vs 7 days ago

+10.1%

gaining

vs 1 year ago

+1.9%

year-over-year

7-day trend

↑

rising

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: UNKNOWN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 20.517, 73.567 · Open in Google Maps

About Damanganga Dam

As of September 24, 2026, Damanganga Dam is filled to 93.7% of its total capacity, holding 16.6 TMC (470 MCM) of a gross 21.7 TMC (615 MCM). At this level the reservoir is high. Of that total, 19.5 TMC (551 MCM) is live storage.

Over the most recent week on record the fill level has risen by 10.1 percentage points, and it is 1.9 points above its level on the same date a year earlier.

Across the readings we hold for Damanganga Dam — 167 data points between June 8, 2023 and September 24, 2026 — the level has ranged from a low of 9.0% (June 22, 2023) to a high of 100.0% (December 4, 2025). On average the reservoir is fullest around October and at its lowest around June.

It is operated by GJ/MH primarily for irrigation. It lies within the West Flowing basin at 20.517°N, 73.567°E.

Key facts

Current fill level
93.7%
Water stored
16.6 TMC (470 MCM)
Total capacity
21.7 TMC (615 MCM)
Usable capacity
19.5 TMC (551 MCM)
7-day change
▲ 10.1 pts
Year-on-year
▲ 1.9 pts
Primary use
Irrigation
River
Damanganga
River basin
West Flowing
Operator
GJ/MH
Coordinates
20.517°N, 73.567°E
Last updated
September 24, 2026

Recent readings

DateFill levelVolume (hm³)
24 Sep 202693.7%470
17 Sep 202683.6%420
10 Sep 202677.9%391
3 Sep 202668.1%342
27 Aug 202663.1%317
20 Aug 202663.1%317
13 Aug 202662.0%311
6 Aug 202651.3%258
30 Jul 202640.4%203
23 Jul 202659.0%296
16 Jul 202639.0%196
9 Jul 202637.8%190

Nearby reservoirs

ShareXLinkedInWhatsApp