reservoirs.earth logo
Reservoirs.EARTH
Uttar Pradesh

Reservoir · Uttar Pradesh · India · CWC · CENTRAL region

Rihand (Govind Ballabh Pant Sagar)

Rihand Dam

79.3% full

Gross capacity

374.3 TMC (10,600 MCM)

Live capacity

314.7 TMC (8,912 MCM)

River

Rihand

Basin

Ganga

Primary use

hydropower

Operator

NTPC

Coordinates

24.192°N, 83.014°E

Last updated

2026-09-10

Capacity in TMC

Rihand (Govind Ballabh Pant Sagar) has a gross capacity of 374.3 TMC (10,600 MCM), of which 314.7 TMC (8,912 MCM) is live storage; it is currently at 79% full, holding 158.2 TMC (4,479 MCM).

Gross capacity
374.3 TMC (10,600 MCM)
Live capacity
314.7 TMC (8,912 MCM)
Current storage
158.2 TMC (4,479 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

Current fill

79.3%
Normal

vs 7 days ago

-1.6%

losing

vs 1 year ago

+3.5%

year-over-year

7-day trend

falling

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: CENTRAL.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 24.192, 83.014 · Open in Google Maps

About Rihand Dam

As of September 10, 2026, Rihand Dam is filled to 79.3% of its total capacity, holding 158.2 TMC (4,479 MCM) of a gross 374.3 TMC (10,600 MCM). At this level the reservoir is within its normal operating range. Of that total, 314.7 TMC (8,912 MCM) is live storage.

Over the most recent week on record the fill level has fallen by 1.6 percentage points, and it is 3.5 points above its level on the same date a year earlier.

Across the readings we hold for Rihand Dam — 72 data points between April 3, 2025 and September 10, 2026 — the level has ranged from a low of 18.0% (July 16, 2026) to a high of 80.9% (September 3, 2026). On average the reservoir is fullest around September and at its lowest around June.

It is operated by NTPC primarily for hydroelectric power. It lies within the Ganga basin at 24.192°N, 83.014°E.

Key facts

Current fill level
79.3%
Water stored
158.2 TMC (4,479 MCM)
Total capacity
374.3 TMC (10,600 MCM)
Usable capacity
314.7 TMC (8,912 MCM)
7-day change
▼ 1.6 pts
Year-on-year
▲ 3.5 pts
Primary use
Hydroelectric power
River
Rihand
River basin
Ganga
Operator
NTPC
Coordinates
24.192°N, 83.014°E
Last updated
September 10, 2026

Recent readings

DateFill levelVolume (hm³)
10 Sep 202679.3%4,479
3 Sep 202680.9%4,571
27 Aug 202673.5%4,152
20 Aug 202659.3%3,352
13 Aug 202633.9%1,914
6 Aug 202627.5%1,551
30 Jul 202624.5%1,385
23 Jul 202620.3%1,147
16 Jul 202618.0%1,016
9 Jul 202619.0%1,075
2 Jul 202619.8%1,116
25 Jun 202621.0%1,189

Nearby reservoirs

ShareXLinkedInWhatsApp