Reservoir · Chhattisgarh · India · CWC · UNKNOWN region
Hasdeo Bango (Minimata)
Hasdeo Bango Dam
78.8% full
Total capacity
4,272 hm³
Live storage
3,439 hm³
River
Hasdeo
Basin
Mahanadi
Primary use
multiple
Operator
CSPGCL
Coordinates
22.417°N, 82.250°E
Last updated
2026-07-30
Current fill
78.8%vs 7 days ago
+5.3%gaining
vs 1 year ago
+33.0%year-over-year
7-day trend
↑rising
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: UNKNOWN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 22.417, 82.250 · Open in Google Maps
About Hasdeo Bango Dam
As of July 30, 2026, Hasdeo Bango Dam is filled to 78.8% of its total capacity, holding roughly 2,399 hm³ of water out of a maximum 4,272 hm³. At this level the reservoir is within its normal operating range. Of that total, about 3,439 hm³ is usable (live) storage.
Over the most recent week on record the fill level has risen by 5.3 percentage points, and it is 33.0 points above its level on the same date a year earlier.
Across the readings we hold for Hasdeo Bango Dam — 66 data points between April 3, 2025 and July 30, 2026 — the level has ranged from a low of 24.1% (June 19, 2025) to a high of 86.8% (September 18, 2025). On average the reservoir is fullest around September and at its lowest around June.
It is operated by CSPGCL primarily for multiple purposes. It lies within the Mahanadi basin at 22.417°N, 82.250°E.
Key facts
- Current fill level
- 78.8%
- Water stored
- 2,399 hm³
- Total capacity
- 4,272 hm³
- Usable capacity
- 3,439 hm³
- 7-day change
- ▲ 5.3 pts
- Year-on-year
- ▲ 33.0 pts
- Primary use
- Multipurpose
- River
- Hasdeo
- River basin
- Mahanadi
- Operator
- CSPGCL
- Coordinates
- 22.417°N, 82.250°E
- Last updated
- July 30, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 30 Jul 2026 | 78.8% | 2,399 |
| 23 Jul 2026 | 73.5% | 2,238 |
| 16 Jul 2026 | 59.3% | 1,807 |
| 9 Jul 2026 | 58.7% | 1,788 |
| 2 Jul 2026 | 53.2% | 1,621 |
| 25 Jun 2026 | 52.7% | 1,605 |
| 4 Jun 2026 | 53.6% | 1,633 |
| 31 May 2026 | 37.2% | 1,134 |
| 29 May 2026 | 53.9% | 1,641 |
| 21 May 2026 | 54.2% | 1,651 |
| 14 May 2026 | 54.5% | 1,659 |
| 7 May 2026 | 54.8% | 1,668 |
Frequently asked questions
What is the current water level of Hasdeo Bango Dam?
As of July 30, 2026, Hasdeo Bango Dam is at 78.8% of its capacity, holding approximately 2,399 hm³ of water, according to CWC data.
Is Hasdeo Bango Dam reservoir full?
No. As of July 30, 2026, Hasdeo Bango Dam is within its normal operating range at 78.8% of its capacity, so it is not full.
Is the water level at Hasdeo Bango Dam rising or falling?
The level at Hasdeo Bango Dam is rising — it gained 5.3 percentage points over the latest week on record.
How much water can Hasdeo Bango Dam hold?
Hasdeo Bango Dam has a total capacity of 4,272 hm³, of which about 3,439 hm³ is usable storage.
Where is Hasdeo Bango Dam reservoir located?
Hasdeo Bango Dam is located in Chhattisgarh, India, within the Mahanadi basin (coordinates 22.417°N, 82.250°E).
What is Hasdeo Bango Dam used for?
Hasdeo Bango Dam is used primarily for multiple purposes, and is managed by CSPGCL.

