← Rajasthan

Reservoir · Rajasthan · India · CWC · NORTHERN region

Jhakam

96.1% of gross capacity

Gross capacity

4.7 TMC (132 MCM)

Live capacity

4.7 TMC (132 MCM)

Primary use

multiple

Operator

CWC

Coordinates

24.170°N, 74.591°E

Last updated

2026-10-22

Capacity in TMC

Jhakam Dam has a gross capacity of 4.7 TMC (132 MCM); it is currently at 96.1% of gross capacity, holding 4.5 TMC (127 MCM).

Gross capacity
4.7 TMC (132 MCM)
Live capacity
4.7 TMC (132 MCM)
Current storage
4.5 TMC (127 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from CWC, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

96.1%
High

vs 7 days ago

0.0 pp

stable

vs 1 year ago

-3.9 pp

year-over-year

7-day trend

→

stable

Drought context

Storage vs October average

102%of normal

96.1% full on 2026-10-22, against an average of 94.0% for October across 4 years of readings (+2.1 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Jhakam had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.34). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC. CWC region: NORTHERN.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 24.170°N, 74.591°E · Open in Google Maps

About Jhakam

As of October 22, 2026, Jhakam is filled to 96.1% of its gross capacity, holding 4.5 TMC (127 MCM) of a gross 4.7 TMC (132 MCM). At this level the reservoir is high.

Over the most recent week on record the fill level has held broadly steady (+0.0 pp), and it is 3.9 points below its level on the same date a year earlier.

Across the readings we hold for Jhakam — 169 data points between June 8, 2023 and October 22, 2026 — the level has ranged from a low of 17.0% (April 4, 2024) to a high of 100.0% (August 29, 2024). On average the reservoir is fullest around October and at its lowest around June.

It is operated by CWC primarily for multiple purposes. It is at 24.170°N, 74.591°E.

Key facts

Current fill level
96.1% of total capacity
Water stored
4.5 TMC (127 MCM)
Total capacity
4.7 TMC (132 MCM)
7-day change
No change
Year-on-year
▼ 3.9 pp
Primary use
Multipurpose
Operator
CWC
Coordinates
24.170°N, 74.591°E
Last updated
October 22, 2026

Recent readings

DateFill levelVolume (hm³)
22 Oct 202696.1%127
15 Oct 202696.1%127
8 Oct 202696.1%127
1 Oct 202693.8%124
24 Sep 202690.9%120
17 Sep 202679.1%104
10 Sep 202676.2%101
3 Sep 202674.5%98
27 Aug 202672.5%96
20 Aug 202669.3%91
13 Aug 202656.3%74
6 Aug 202651.7%68

Nearby reservoirs