reservoirs.earth logo
Reservoirs.EARTH
← Madhya Pradesh

Reservoir · Madhya Pradesh · India · CWC · CENTRAL region

Gandhi Sagar

Gandhi Sagar Reservoir

71.4% full

Gross capacity

258.6 TMC (7,322 MCM)

Live capacity

243.0 TMC (6,880 MCM)

River

Chambal

Basin

Ganga

Primary use

multiple

Operator

CWPC

Coordinates

24.691°N, 75.550°E

Last updated

2026-09-24

Capacity in TMC

Gandhi Sagar has a gross capacity of 258.6 TMC (7,322 MCM), of which 243.0 TMC (6,880 MCM) is live storage; it is currently at 71% full, holding 172.2 TMC (4,875 MCM).

Gross capacity
258.6 TMC (7,322 MCM)
Live capacity
243.0 TMC (6,880 MCM)
Current storage
172.2 TMC (4,875 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.

⏳Data older than 14 days — last reading 2026-09-24. Shown for reference; it may not reflect current levels.

Current fill

71.4%
Normal

vs 7 days ago

+1.3%

gaining

vs 1 year ago

-23.2%

year-over-year

7-day trend

→

stable

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: CENTRAL.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 24.691, 75.550 · Open in Google Maps

About Gandhi Sagar Reservoir

As of September 24, 2026, Gandhi Sagar Reservoir is filled to 71.4% of its total capacity, holding 172.2 TMC (4,875 MCM) of a gross 258.6 TMC (7,322 MCM). At this level the reservoir is within its normal operating range. Of that total, 243.0 TMC (6,880 MCM) is live storage.

Over the most recent week on record the fill level has held broadly steady (+1.3 pts), and it is 23.2 points below its level on the same date a year earlier.

Across the readings we hold for Gandhi Sagar Reservoir — 167 data points between June 8, 2023 and September 24, 2026 — the level has ranged from a low of 41.0% (June 19, 2025) to a high of 97.0% (October 17, 2024). On average the reservoir is fullest around October and at its lowest around June.

It is operated by CWPC primarily for multiple purposes. It lies within the Ganga basin at 24.691°N, 75.550°E.

Key facts

Current fill level
71.4%
Water stored
172.2 TMC (4,875 MCM)
Total capacity
258.6 TMC (7,322 MCM)
Usable capacity
243.0 TMC (6,880 MCM)
7-day change
▲ 1.3 pts
Year-on-year
▼ 23.2 pts
Primary use
Multipurpose
River
Chambal
River basin
Ganga
Operator
CWPC
Coordinates
24.691°N, 75.550°E
Last updated
September 24, 2026

Recent readings

DateFill levelVolume (hm³)
24 Sep 202671.4%4,875
17 Sep 202670.1%4,785
10 Sep 202668.0%4,644
3 Sep 202666.4%4,536
27 Aug 202665.8%4,493
20 Aug 202664.8%4,420
13 Aug 202663.6%4,340
6 Aug 202662.3%4,255
30 Jul 202662.3%4,254
23 Jul 202662.7%4,280
16 Jul 202663.2%4,314
9 Jul 202662.9%4,292

Nearby reservoirs

ShareXLinkedInWhatsApp