Reservoir · Maharashtra · India · CWC · UNKNOWN region
Girna
Girna Dam
99.0% full
Gross capacity
53.5 TMC (1,516 MCM)
Live capacity
51.4 TMC (1,456 MCM)
River
Girna
Basin
Godavari
Primary use
irrigation
Operator
MWRRA
Coordinates
20.267°N, 74.683°E
Last updated
2026-09-10
Capacity in TMC
Girna Dam has a gross capacity of 53.5 TMC (1,516 MCM), of which 51.4 TMC (1,456 MCM) is live storage; it is currently at 99% full, holding 18.3 TMC (519 MCM).
- Gross capacity
- 53.5 TMC (1,516 MCM)
- Live capacity
- 51.4 TMC (1,456 MCM)
- Current storage
- 18.3 TMC (519 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from the Central Water Commission bulletin, which publishes million cubic metres.
Current fill
99.0%vs 7 days ago
0.0%stable
vs 1 year ago
+2.5%year-over-year
7-day trend
→stable
Weekly storage
Fill history — multi-year
About this reservoir
Data source
official
Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India. CWC region: UNKNOWN.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 20.267, 74.683 · Open in Google Maps
About Girna Dam
As of September 10, 2026, Girna Dam is filled to 99.0% of its total capacity, holding 18.3 TMC (519 MCM) of a gross 53.5 TMC (1,516 MCM). At this level the reservoir is high. Of that total, 51.4 TMC (1,456 MCM) is live storage.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it is 2.5 points above its level on the same date a year earlier.
Across the readings we hold for Girna Dam — 165 data points between June 8, 2023 and September 10, 2026 — the level has ranged from a low of 12.0% (June 5, 2024) to a high of 100.0% (September 19, 2024). On average the reservoir is fullest around October and at its lowest around June.
It is operated by MWRRA primarily for irrigation. It lies within the Godavari basin at 20.267°N, 74.683°E.
Key facts
- Current fill level
- 99.0%
- Water stored
- 18.3 TMC (519 MCM)
- Total capacity
- 53.5 TMC (1,516 MCM)
- Usable capacity
- 51.4 TMC (1,456 MCM)
- 7-day change
- No change
- Year-on-year
- ▲ 2.5 pts
- Primary use
- Irrigation
- River
- Girna
- River basin
- Godavari
- Operator
- MWRRA
- Coordinates
- 20.267°N, 74.683°E
- Last updated
- September 10, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 10 Sep 2026 | 99.0% | 519 |
| 3 Sep 2026 | 99.0% | 519 |
| 27 Aug 2026 | 99.0% | 519 |
| 20 Aug 2026 | 99.0% | 519 |
| 13 Aug 2026 | 99.0% | 519 |
| 6 Aug 2026 | 99.0% | 519 |
| 30 Jul 2026 | 92.7% | 485 |
| 23 Jul 2026 | 42.5% | 223 |
| 16 Jul 2026 | 40.3% | 211 |
| 9 Jul 2026 | 35.3% | 185 |
| 2 Jul 2026 | 23.1% | 121 |
| 25 Jun 2026 | 24.7% | 129 |

