← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Chitravati Balancing Reservoir

31.2% of gross capacity

Gross capacity

10.2 TMC (290 MCM)

Live capacity

9.9 TMC (279 MCM)

Basin

Pennar

Operator

AP Water Resources Dept

Coordinates

14.562°N, 77.959°E

Last updated

2026-10-27

Capacity in TMC

Chitravati Balancing Reservoir has a gross capacity of 10.2 TMC (290 MCM), of which 9.9 TMC (279 MCM) is live storage; it is currently at 31.2% of gross capacity, holding 3.2 TMC (90 MCM) (32.3% of live capacity).

Gross capacity
10.2 TMC (290 MCM)
Live capacity
9.9 TMC (279 MCM)
Current storage
3.2 TMC (90 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

31.2%
Low

vs 22 Oct 2026

-0.3 pp

losing

vs 1 year ago

N/A

Trend

→

stable

Drought context

Rain over the last three months · 11 October 2026

Extremely dry

In the three months to 11 October 2026 the area around Chitravati Balancing Reservoir had extremely little rain for the season, a shortfall seen about one year in forty. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −2.48). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 14.562°N, 77.959°E · Open in Google Maps

About Chitravati Balancing Reservoir

As of October 27, 2026, Chitravati Balancing Reservoir is filled to 31.2% of its gross capacity, holding 3.2 TMC (90 MCM) of a gross 10.2 TMC (290 MCM). At this level the reservoir is low. Of that total, 9.9 TMC (279 MCM) is live storage.

Since October 22, 2026 the fill level has held broadly steady (-0.3 pp).

Across the readings we hold for Chitravati Balancing Reservoir — 13 data points between July 2, 2026 and October 27, 2026 — the level has ranged from a low of 31.2% (October 27, 2026) to a high of 40.3% (July 2, 2026).

It is operated by AP Water Resources Dept. It lies within the Pennar basin at 14.562°N, 77.959°E.

Key facts

Current fill level
31.2% of total capacity
Water stored
3.2 TMC (90 MCM)
Total capacity
10.2 TMC (290 MCM)
Usable capacity
9.9 TMC (279 MCM)
Change since October 22, 2026
▼ 0.3 pp
River basin
Pennar
Operator
AP Water Resources Dept
Coordinates
14.562°N, 77.959°E
Last updated
October 27, 2026

Recent readings

DateFill levelVolume (hm³)
27 Oct 202631.2%90
22 Oct 202631.5%91
16 Sep 202633.8%98
9 Sep 202634.7%100
2 Sep 202636.3%105
27 Aug 202637.2%108
20 Aug 202633.5%97
13 Aug 202631.3%91
4 Aug 202632.9%95
29 Jul 202634.0%99
22 Jul 202635.1%102
15 Jul 202636.4%105

Nearby reservoirs