Reservoir · Andhra Pradesh · India · AP-WRIMS
Cherlopalli Reservoir
79.2% of gross capacity
Gross capacity
1.6 TMC (45.533 MCM)
Live capacity
1.3 TMC (35.623 MCM)
Basin
Pennar
Reported
November 13, 2026
Capacity in TMC
Cherlopalli Reservoir has a gross capacity of 1.6 TMC (45.533 MCM), of which 1.3 TMC (35.623 MCM) is live storage; it is currently at 79.2% of gross capacity, holding 1.3 TMC (36.047 MCM) (101.2% of live capacity).
- Gross capacity
- 1.6 TMC (45.533 MCM)
- Live capacity
- 1.3 TMC (35.623 MCM)
- Current storage
- 1.3 TMC (36.047 MCM)
TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.
Current fill
79.2%vs 5 Nov 2026
+11.6 ppgaining
vs 1 year ago
N/ATrend
↑rising
Drought context
India drought →Rainfall, last 3 months
Extremely dry
SPI-3 −2.59 · to 21 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 13 Nov 2026 | 79.2% | 36.047 |
| 12 Nov 2026 | 78.0% | 35.538 |
| 11 Nov 2026 | 76.9% | 35 |
| 10 Nov 2026 | 75.4% | 34.32 |
| 8 Nov 2026 | 72.1% | 32.819 |
| 5 Nov 2026 | 67.5% | 30.752 |
| 4 Nov 2026 | 66.3% | 30.186 |
| 3 Nov 2026 | 65.0% | 29.591 |
| 2 Nov 2026 | 63.6% | 28.968 |
| 29 Oct 2026 | 59.5% | 27.071 |
| 28 Oct 2026 | 59.6% | 27.127 |
| 27 Oct 2026 | 59.6% | 27 |
Weekly storage
Fill history — multi-year
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Operator | AP Water Resources Dept |
| Coordinates | 14.035°N, 78.113°E |
About this reservoir
Data source
official
Storage data: AP-WRIMS.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 14.035°N, 78.113°E · Open in Google Maps
About Cherlopalli Reservoir
As of November 13, 2026, Cherlopalli Reservoir is filled to 79.2% of its gross capacity, holding 1.3 TMC (36.047 MCM) of a gross 1.6 TMC (45.533 MCM). At this level the reservoir is within its normal operating range. Of that total, 1.3 TMC (35.623 MCM) is live storage.
Since November 5, 2026 the fill level has risen by 11.6 percentage points.
Across the readings we hold for Cherlopalli Reservoir — 24 data points between July 2, 2026 and November 13, 2026 — the level has ranged from a low of 27.8% (August 20, 2026) to a high of 79.2% (November 13, 2026).
It is operated by AP Water Resources Dept. It lies within the Pennar basin at 14.035°N, 78.113°E.