reservoirs.earth logo
Reservoirs.EARTH
Andhra Pradesh

Reservoir · Andhra Pradesh · India · CWC

Chennaraya Swami Gudi Project

50.7% full

Total capacity

5 hm³

Live storage

5 hm³

River

Pennar

Basin

Pennar

Operator

AP Water Resources Dept

Coordinates

13.861°N, 78.180°E

Last updated

2026-07-29

Current fill

50.7%
Normal

vs 7 days ago

-0.5%

losing

vs 1 year ago

N/A

7-day trend

stable

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: CWC (Central Water Commission) Weekly Storage Bulletin, India.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 13.861, 78.180 · Open in Google Maps

About Chennaraya Swami Gudi Project

As of July 29, 2026, Chennaraya Swami Gudi Project is filled to 50.7% of its total capacity, holding roughly 2 hm³ of water out of a maximum 5 hm³. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has held broadly steady (-0.5 pts).

Across the readings we hold for Chennaraya Swami Gudi Project — 4 data points between July 1, 2026 and July 29, 2026 — the level has ranged from a low of 50.7% (July 29, 2026) to a high of 72.4% (July 1, 2026).

It is operated by AP Water Resources Dept. It lies within the Pennar basin at 13.861°N, 78.180°E.

Key facts

Current fill level
50.7%
Water stored
2 hm³
Total capacity
5 hm³
7-day change
▼ 0.5 pts
River
Pennar
River basin
Pennar
Operator
AP Water Resources Dept
Coordinates
13.861°N, 78.180°E
Last updated
July 29, 2026

Recent readings

DateFill levelVolume (hm³)
29 Jul 202650.7%2
22 Jul 202651.2%2
15 Jul 202672.4%3
1 Jul 202672.4%3

Frequently asked questions

What is the current water level of Chennaraya Swami Gudi Project?

As of July 29, 2026, Chennaraya Swami Gudi Project is at 50.7% of its capacity, holding approximately 2 hm³ of water, according to AP-WRIMS data.

Is Chennaraya Swami Gudi Project reservoir full?

No. As of July 29, 2026, Chennaraya Swami Gudi Project is within its normal operating range at 50.7% of its capacity, so it is not full.

Is the water level at Chennaraya Swami Gudi Project rising or falling?

The level at Chennaraya Swami Gudi Project has been broadly stable over the latest week on record (-0.5 points).

How much water can Chennaraya Swami Gudi Project hold?

Chennaraya Swami Gudi Project has a total capacity of 5 hm³.

Where is Chennaraya Swami Gudi Project reservoir located?

Chennaraya Swami Gudi Project is located in Andhra Pradesh, India, within the Pennar basin (coordinates 13.861°N, 78.180°E).

Nearby reservoirs

ShareXLinkedInWhatsApp