← Andhra Pradesh

Reservoir · Andhra Pradesh · India · AP-WRIMS

Chennaraya Swami Gudi Project

50.3% full

Gross capacity

0.18 TMC (5 MCM)

Live capacity

0.18 TMC (5 MCM)

Basin

Pennar

Operator

AP Water Resources Dept

Coordinates

13.861°N, 78.180°E

Last updated

2026-10-27

Capacity in TMC

Chennaraya Swami Gudi Project Dam has a gross capacity of 0.18 TMC (5 MCM); it is currently at 50.3% full, holding 0.07 TMC (2 MCM).

Gross capacity
0.18 TMC (5 MCM)
Live capacity
0.18 TMC (5 MCM)
Current storage
0.07 TMC (2 MCM)

TMC is thousand million cubic feet, the unit used in Indian water reporting. 1 TMC = 28.3168 million cubic metres (MCM). Figures are converted from AP-WRIMS, which publishes million cubic metres. The percentage is labelled live or gross only when the stored volume matches that capacity.

Current fill

50.3%
Normal

vs 22 Oct 2026

+0.5 pp

gaining

vs 1 year ago

N/A

Trend

→

stable

Drought context

Rain over the last three months · 11 October 2026

Extremely dry

In the three months to 11 October 2026 the area around Chennaraya Swami Gudi Project had extremely little rain for the season, a shortfall seen about one year in forty. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −2.69). Rain, not storage. India drought figures →

Weekly storage

Fill history — multi-year

About this reservoir

Data source

official

Storage data: AP-WRIMS.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 13.861°N, 78.180°E · Open in Google Maps

About Chennaraya Swami Gudi Project

As of October 27, 2026, Chennaraya Swami Gudi Project has a published fill of 50.3%, holding 0.07 TMC (2 MCM). Gross capacity is 0.18 TMC (5 MCM). At this level the reservoir is within its normal operating range.

Since October 22, 2026 the fill level has held broadly steady (+0.5 pp).

Across the readings we hold for Chennaraya Swami Gudi Project — 13 data points between July 1, 2026 and October 27, 2026 — the level has ranged from a low of 46.8% (September 16, 2026) to a high of 72.4% (July 1, 2026).

It is operated by AP Water Resources Dept. It lies within the Pennar basin at 13.861°N, 78.180°E.

Key facts

Current fill level
50.3%
Water stored
0.07 TMC (2 MCM)
Total capacity
0.18 TMC (5 MCM)
Change since October 22, 2026
▲ 0.5 pp
River basin
Pennar
Operator
AP Water Resources Dept
Coordinates
13.861°N, 78.180°E
Last updated
October 27, 2026

Recent readings

DateFill levelVolume (hm³)
27 Oct 202650.3%2
22 Oct 202649.8%2
16 Sep 202646.8%2
9 Sep 202647.2%2
2 Sep 202647.6%2
27 Aug 202648.2%2
20 Aug 202648.2%2
13 Aug 202649.4%2
4 Aug 202650.3%2
29 Jul 202650.7%2
22 Jul 202651.2%2
15 Jul 202672.4%3

Nearby reservoirs