reservoirs.earth logo
Reservoirs.EARTH
← Hong Kong
Highwater supply

Tai Lam Chung Reservoir

New Territories · New Territories · New Territories catchments

Capacity

20.49 hm³

Coordinates

22.375°N, 114.023°E

Operator

Water Supplies Department (WSD)

87.3% full

Current fill

87.3%
High

vs 7 days ago

0.0%

stable

vs 1 year ago

-12.7%

year-over-year

7-day trend

→

stable

Drought context

Storage vs October average

102%of normal

87.3% full on 2026-10-01, against an average of 85.3% for October across 8 years of readings (+2.0 points).

Rain over the last three months · 21 September 2026

Near normal

In the three months to 21 September 2026 the area around Tai Lam Chung Reservoir had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index +0.38). Rain, not storage. Hong Kong drought figures →

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity20.49 hm³
Usable capacity20.49 hm³
Year built1957
Primary usewater supply
OperatorWater Supplies Department (WSD)
ProvinceNew Territories
Autonomous communityNew Territories
River basinNew Territories catchments
Data source:WSD·Last reading: 2026-10-01

Satellite imagery: Esri, Maxar, Earthstar Geographics. 22.375, 114.023 · Open in Google Maps

About Tai Lam Chung Reservoir

As of October 1, 2026, Tai Lam Chung Reservoir is filled to 87.3% of its total capacity, holding roughly 18 hm³ of water out of a maximum 20 hm³. At this level the reservoir is high.

Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it is 12.7 points below its level on the same date a year earlier.

Across the readings we hold for Tai Lam Chung Reservoir — 184 data points between January 16, 2019 and October 1, 2026 — the level has ranged from a low of 48.1% (October 1, 2021) to a high of 100.0% (June 16, 2022). On average the reservoir is fullest around October and at its lowest around January.

The dam at Tai Lam Chung Reservoir was completed in 1957. It is operated by Water Supplies Department (WSD) primarily for water supply. It lies within the New Territories catchments basin at 22.375°N, 114.023°E.

Key facts

Current fill level
87.3%
Water stored
18 hm³
Total capacity
20 hm³
7-day change
No change
Year-on-year
▼ 12.7 pts
Primary use
Water supply
River basin
New Territories catchments
Year completed
1957
Operator
Water Supplies Department (WSD)
Coordinates
22.375°N, 114.023°E
Last updated
October 1, 2026

Recent readings

DateFill levelVolume (hm³)
1 Oct 202687.3%18
16 Sep 202696.8%20
1 Sep 202699.5%20
16 Aug 2026100.0%20
1 Aug 2026100.0%20
16 Jul 2026100.0%20
1 Jul 2026100.0%20
16 Jun 202672.3%15
1 Jun 202656.4%12
16 May 202663.4%13
1 May 202675.2%15
16 Apr 202674.3%15

Nearby reservoirs

ShareXLinkedInWhatsApp