Shek Lei Pui Reservoir
Kowloon · Kowloon · Kowloon catchments
Capacity
0.374 hm³
Coordinates
22.352°N, 114.144°E
Operator
Water Supplies Department (WSD)
100.0% full
Current fill
100.0%vs 7 days ago
0.0%stable
vs 1 year ago
0.0%year-over-year
7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 0.374 hm³ |
| Usable capacity | 0.374 hm³ |
| Year built | 1925 |
| Primary use | water supply |
| Operator | Water Supplies Department (WSD) |
| Province | Kowloon |
| Autonomous community | Kowloon |
| River basin | Kowloon catchments |
Satellite imagery: Esri, Maxar, Earthstar Geographics. 22.352, 114.144 · Open in Google Maps
About Shek Lei Pui Reservoir
As of October 1, 2026, Shek Lei Pui Reservoir is filled to 100.0% of its total capacity, holding roughly 0 hm³ of water out of a maximum 0 hm³. At this level the reservoir is high.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it sits close to where it was a year earlier.
Across the readings we hold for Shek Lei Pui Reservoir — 184 data points between January 16, 2019 and October 1, 2026 — the level has ranged from a low of 21.4% (June 1, 2021) to a high of 100.0% (August 1, 2019). On average the reservoir is fullest around September and at its lowest around May.
The dam at Shek Lei Pui Reservoir was completed in 1925. It is operated by Water Supplies Department (WSD) primarily for water supply. It lies within the Kowloon catchments basin at 22.352°N, 114.144°E.
Key facts
- Current fill level
- 100.0%
- Water stored
- 0 hm³
- Total capacity
- 0 hm³
- 7-day change
- No change
- Year-on-year
- No change
- Primary use
- Water supply
- River basin
- Kowloon catchments
- Year completed
- 1925
- Operator
- Water Supplies Department (WSD)
- Coordinates
- 22.352°N, 114.144°E
- Last updated
- October 1, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 1 Oct 2026 | 100.0% | 0 |
| 16 Sep 2026 | 100.0% | 0 |
| 1 Sep 2026 | 100.0% | 0 |
| 16 Aug 2026 | 100.0% | 0 |
| 1 Aug 2026 | 100.0% | 0 |
| 16 Jul 2026 | 100.0% | 0 |
| 1 Jul 2026 | 100.0% | 0 |
| 16 Jun 2026 | 100.0% | 0 |
| 1 Jun 2026 | 88.0% | 0 |
| 16 May 2026 | 82.6% | 0 |
| 1 May 2026 | 81.6% | 0 |
| 16 Apr 2026 | 82.4% | 0 |
