PEIXE ANGICAL
Tocantins · TOCANTINS
Capacity
2,741 hm³
Coordinates
-12.238°N, 48.383°W
Operator
ONS
67.3% full
Current fill
67.3%vs 7 days ago
+2.1%gaining
vs 1 year ago
N/A7-day trend
↑rising
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 2,741 hm³ |
| Usable capacity | 526.82 hm³ |
| Primary use | Hydroelectric |
| Operator | ONS |
| River | TOCANTINS |
| Province | Tocantins |
| River basin | TOCANTINS |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -12.238, -48.383 · Open in Google Maps
About PEIXE ANGICAL
As of October 7, 2026, PEIXE ANGICAL is filled to 67.3% of its total capacity, holding roughly 354 hm³ of water out of a maximum 2,741 hm³. At this level the reservoir is within its normal operating range. Of that total, about 527 hm³ is usable (live) storage.
Over the most recent week on record the fill level has risen by 2.1 percentage points.
Across the readings we hold for PEIXE ANGICAL — 52 data points between October 24, 2025 and October 7, 2026 — the level has ranged from a low of 11.2% (January 2, 2026) to a high of 94.1% (April 17, 2026). On average the reservoir is fullest around March and at its lowest around December.
It is operated by ONS primarily for hydroelectric power. It lies within the TOCANTINS basin at 12.238°S, 48.383°W.
Key facts
- Current fill level
- 67.3%
- Water stored
- 354 hm³
- Total capacity
- 2,741 hm³
- Usable capacity
- 527 hm³
- 7-day change
- ▲ 2.1 pts
- Primary use
- Hydroelectric power
- River
- TOCANTINS
- River basin
- TOCANTINS
- Operator
- ONS
- Coordinates
- 12.238°S, 48.383°W
- Last updated
- October 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Oct 2026 | 67.3% | 354 |
| 2 Oct 2026 | 65.2% | 344 |
| 25 Sep 2026 | 94.1% | 496 |
| 18 Sep 2026 | 89.3% | 470 |
| 11 Sep 2026 | 86.6% | 456 |
| 4 Sep 2026 | 63.2% | 333 |
| 28 Aug 2026 | 59.6% | 314 |
| 21 Aug 2026 | 62.1% | 327 |
| 14 Aug 2026 | 53.5% | 282 |
| 7 Aug 2026 | 51.5% | 271 |
| 31 Jul 2026 | 60.1% | 317 |
| 24 Jul 2026 | 67.8% | 357 |

