Thune Dam
Central District · Central District · Thune
Capacity
90 hm³
Coordinates
-22.271°N, 28.801°E
Operator
Water Utilities Corporation (WUC)
80.5% full
Current fill
80.5%vs 7 days ago
0.0%stable
vs 1 year ago
N/A7-day trend
→stable
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 90 hm³ |
| Usable capacity | 90 hm³ |
| Year built | 2012 |
| Primary use | water supply |
| Operator | Water Utilities Corporation (WUC) |
| River | Thune River |
| Province | Central District |
| Autonomous community | Central District |
| River basin | Thune |
About Thune Dam
As of October 5, 2026, Thune Dam is filled to 80.5% of its total capacity, holding roughly 73 Mm³ of water out of a maximum 90 Mm³. At this level the reservoir is high.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts).
Across the readings we hold for Thune Dam — 1 data points between October 5, 2026 and October 5, 2026 — the level has ranged from a low of 80.5% (October 5, 2026) to a high of 80.5% (October 5, 2026).
The dam at Thune Dam was completed in 2012. It is operated by Water Utilities Corporation (WUC) primarily for water supply. It lies within the Thune basin at 22.271°S, 28.801°E.
Key facts
- Current fill level
- 80.5%
- Water stored
- 73 Mm³
- Total capacity
- 90 Mm³
- 7-day change
- No change
- Primary use
- Water supply
- River
- Thune River
- River basin
- Thune
- Year completed
- 2012
- Operator
- Water Utilities Corporation (WUC)
- Coordinates
- 22.271°S, 28.801°E
- Last updated
- October 5, 2026
Recent readings
| Date | Fill level | Volume (Mm³) |
|---|---|---|
| 5 Oct 2026 | 80.5% | 72 |