Letsibogo Dam
Central District · Motloutse
Capacity
100 hm³
Reported
November 2, 2026
80.8% full
Current fill
80.8%vs 7 days ago
Stale7-day trend
StaleDrought context
Botswana drought →Rainfall, last 3 months
Near normal
SPI-3 +0.59 · to 1 Nov 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (Mm³) |
|---|---|---|
| 2 Nov 2026 | 80.8% | 80.8 |
| 26 Oct 2026 | 80.8% | 80.8 |
| 13 Oct 2026 | 82.0% | 82 |
| 5 Oct 2026 | 73.3% | 73.3 |
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Dam height | 28 m |
| Year built | 2000 |
| Operator | Water Utilities Corporation (WUC) |
| River | Motloutse River |
| Coordinates | 21.845°S, 27.735°E |
About Letsibogo Dam
As of November 2, 2026, Letsibogo Dam is filled to 80.8% of its total capacity, holding 80.8 Mm³ of water out of a maximum 100 Mm³. The reading is past the freshness window, so it is shown as stale.
The 7-day change is not shown, because the latest reading is past the freshness window.
Across the readings we hold for Letsibogo Dam — 4 data points between October 5, 2026 and November 2, 2026 — the level has ranged from a low of 73.3% (October 5, 2026) to a high of 82.0% (October 13, 2026).
The dam at Letsibogo Dam stands 28 m tall and was completed in 2000. It is operated by Water Utilities Corporation (WUC) primarily for water supply. It lies within the Motloutse basin at 21.845°S, 27.735°E.