← Western Australia

Reservoir · Western Australia · Australia · BOM Water Data Online

Wellington

42.4% full

Capacity

184.9 hm³

Volume stored

78 hm³

River

Collie River

Year completed

1933

Reported

November 8, 2026

Current fill

42.4%
Normal

vs 7 days ago

-0.5 pp

losing

vs 1 year ago

-14.3 pp

year-over-year

7-day trend

→

stable

Drought context

Australia drought →

Storage vs November average

77%of normal

42.4% now · 54.8% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 −0.75 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
8 Nov 202642.4%78.36
7 Nov 202642.4%78.48
6 Nov 202642.5%78.61
5 Nov 202642.6%78.78
4 Nov 202642.7%78.95
3 Nov 202642.8%79.06
2 Nov 202642.8%79.17
1 Nov 202642.9%79.39
31 Oct 202643.1%79.63
30 Oct 202643.1%79.77
29 Oct 202642.9%79.28
28 Oct 202642.6%78.82

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity183.9 hm³
Primary useWater supply
River basinCollie River Basin
Coordinates33.384°S, 116.009°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-08.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 33.384°S, 116.009°E · Open in Google Maps

About Wellington

As of November 8, 2026, Wellington is filled to 42.4% of its total capacity, holding 78.36 hm³ of water out of a maximum 184.9 hm³. At this level the reservoir is within its normal operating range. Of that total, 183.9 hm³ is usable (live) storage.

Over the most recent week on record the fill level has held broadly steady (-0.5 pp), and it is 14.3 points below its level on the same date a year earlier.

Across the readings we hold for Wellington — 1068 data points between November 13, 2023 and November 8, 2026 — the level has ranged from a low of 29.3% (May 9, 2024) to a high of 58.2% (November 13, 2023). On average the reservoir is fullest around November and at its lowest around May.

The dam at Wellington was completed in 1933. It is operated by BOM primarily for water supply. It lies within the Collie River Basin basin at 33.384°S, 116.009°E.

Nearby reservoirs