Reservoir · Queensland · Australia · BOM Water Data Online
Theodore Weir
99.7% full
Capacity
4.8 hm³
Volume stored
5 hm³
Year completed
1932
Coordinates
24.965°S, 150.073°E
Last updated
2026-06-10
Current fill
99.7%vs 7 days ago
-0.9%losing
vs 1 year ago
-2.0%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-06-10.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -24.965, 150.073 · Open in Google Maps
About Theodore Weir
As of June 10, 2026, Theodore Weir is filled to 99.7% of its total capacity, holding roughly 5 hm³ of water out of a maximum 5 hm³. At this level the reservoir is high. Of that total, about 4 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (-0.9 pts), and it is 2.0 points below its level on the same date a year earlier.
Across the readings we hold for Theodore Weir — 1081 data points between June 12, 2023 and June 10, 2026 — the level has ranged from a low of 77.0% (October 1, 2023) to a high of 146.5% (February 4, 2024). On average the reservoir is fullest around February and at its lowest around October.
The dam at Theodore Weir was completed in 1932. It is operated by BOM primarily for water supply.
Key facts
- Current fill level
- 99.7%
- Water stored
- 5 hm³
- Total capacity
- 5 hm³
- Usable capacity
- 4 hm³
- 7-day change
- ▼ 0.9 pts
- Year-on-year
- ▼ 2.0 pts
- Primary use
- Water supply
- Year completed
- 1932
- Operator
- BOM
- Coordinates
- 24.965°S, 150.073°E
- Last updated
- June 10, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 10 Jun 2026 | 99.7% | 5 |
| 9 Jun 2026 | 100.6% | 5 |
| 8 Jun 2026 | 101.5% | 5 |
| 7 Jun 2026 | 101.6% | 5 |
| 6 Jun 2026 | 101.5% | 5 |
| 5 Jun 2026 | 101.4% | 5 |
| 4 Jun 2026 | 101.6% | 5 |
| 3 Jun 2026 | 102.3% | 5 |
| 2 Jun 2026 | 102.3% | 5 |
| 1 Jun 2026 | 102.2% | 5 |
| 31 May 2026 | 102.1% | 5 |
| 30 May 2026 | 101.7% | 5 |
Frequently asked questions
What is the current water level of Theodore Weir?
As of June 10, 2026, Theodore Weir is at 99.7% of its capacity, holding approximately 5 hm³ of water, according to BOM data.
Is Theodore Weir reservoir full?
Theodore Weir is essentially full, sitting at 99.7% of capacity as of June 10, 2026.
Is the water level at Theodore Weir rising or falling?
The level at Theodore Weir has been broadly stable over the latest week on record (-0.9 points).
How much water can Theodore Weir hold?
Theodore Weir has a total capacity of 5 hm³, of which about 4 hm³ is usable storage.
Where is Theodore Weir reservoir located?
Theodore Weir is located in Queensland, Australia (coordinates 24.965°S, 150.073°E).
When was Theodore Weir dam built?
The dam at Theodore Weir was completed in 1932.
What is Theodore Weir used for?
Theodore Weir is used primarily for water supply, and is managed by BOM.

