← Victoria

Reservoir · Victoria · Australia · BOM Water Data Online

Rocklands Reservoir

44.4% full

Capacity

296 hm³

Volume stored

131 hm³

River

Mid-Glenelg River

Year completed

1953

Reported

November 12, 2026

Current fill

44.4%
Normal

vs 7 days ago

-0.3 pp

losing

vs 1 year ago

+9.5 pp

year-over-year

7-day trend

→

stable

Drought context

Australia drought →

Storage vs November average

100%of normal

44.4% now · 44.5% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 −0.02 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
12 Nov 202644.4%131.33
11 Nov 202644.4%131.55
10 Nov 202644.5%131.77
9 Nov 202644.6%131.98
8 Nov 202644.6%132.13
7 Nov 202644.7%132.18
6 Nov 202644.7%132.31
5 Nov 202644.7%132.44
4 Nov 202644.8%132.5
3 Nov 202644.8%132.67
2 Nov 202644.8%132.53
1 Nov 202644.7%132.21

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity293 hm³
Primary useWater supply
River basinMid-Glenelg River Basin
Coordinates37.252°S, 142.074°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-12.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.252°S, 142.074°E · Open in Google Maps

About Rocklands Reservoir

As of November 12, 2026, Rocklands Reservoir is filled to 44.4% of its total capacity, holding 131.33 hm³ of water out of a maximum 296 hm³. At this level the reservoir is within its normal operating range. Of that total, 293 hm³ is usable (live) storage.

Over the most recent week on record the fill level has held broadly steady (-0.3 pp), and it is 9.5 points above its level on the same date a year earlier.

Across the readings we hold for Rocklands Reservoir — 1096 data points between November 13, 2023 and November 12, 2026 — the level has ranged from a low of 25.9% (April 30, 2026) to a high of 58.6% (November 13, 2023). On average the reservoir is fullest around December and at its lowest around May.

The dam at Rocklands Reservoir was completed in 1953. It is operated by BOM primarily for water supply. It lies within the Mid-Glenelg River Basin basin at 37.252°S, 142.074°E.

Nearby reservoirs