← Victoria

Reservoir · Victoria · Australia · BOM Water Data Online

Rocklands Reservoir

44.9% full

Capacity

296 hm³

Volume stored

133 hm³

River

Mid-Glenelg River

Year completed

1953

Coordinates

37.252°S, 142.074°E

Last updated

2026-10-27

Current fill

44.9%
Normal

vs 7 days ago

+0.1 pp

gaining

vs 1 year ago

+10.4 pp

year-over-year

7-day trend

→

stable

Drought context

Storage vs October average

106%of normal

44.9% full on 2026-10-27, against an average of 42.5% for October across 4 years of readings (+2.4 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Rocklands Reservoir had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.87). Rain, not storage. Australia drought figures →

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-10-27.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.252°S, 142.074°E · Open in Google Maps

About Rocklands Reservoir

As of October 27, 2026, Rocklands Reservoir is filled to 44.9% of its total capacity, holding 132.78 hm³ of water out of a maximum 296 hm³. At this level the reservoir is within its normal operating range. Of that total, 293 hm³ is usable (live) storage.

Over the most recent week on record the fill level has held broadly steady (+0.1 pp), and it is 10.4 points above its level on the same date a year earlier.

Across the readings we hold for Rocklands Reservoir — 1096 data points between October 28, 2023 and October 27, 2026 — the level has ranged from a low of 25.9% (April 30, 2026) to a high of 59.9% (October 28, 2023). On average the reservoir is fullest around November and at its lowest around May.

The dam at Rocklands Reservoir was completed in 1953. It is operated by BOM primarily for water supply. It lies within the Mid-Glenelg River Basin basin at 37.252°S, 142.074°E.

Key facts

Current fill level
44.9% of total capacity
Water stored
132.78 hm³
Total capacity
296 hm³
Usable capacity
293 hm³
7-day change
▲ 0.1 pp
Year-on-year
▲ 10.4 pp
Primary use
Water supply
River
Mid-Glenelg River
River basin
Mid-Glenelg River Basin
Year completed
1953
Operator
BOM
Coordinates
37.252°S, 142.074°E
Last updated
October 27, 2026

Recent readings

DateFill levelVolume (hm³)
27 Oct 202644.9%132.78
26 Oct 202644.9%132.87
25 Oct 202644.9%132.88
24 Oct 202644.8%132.7
23 Oct 202644.8%132.67
22 Oct 202644.9%132.83
21 Oct 202644.9%132.76
20 Oct 202644.8%132.64
19 Oct 202644.8%132.65
18 Oct 202644.8%132.64
17 Oct 202644.8%132.49
16 Oct 202644.7%132.3

Nearby reservoirs