Reservoir · Victoria · Australia · BOM Water Data Online
Moora Moora Reservoir
98.0% full
Capacity
6.3 hm³
Volume stored
6 hm³
River
Upper Glenelg River
Year completed
1934
Coordinates
37.231°S, 142.426°E
Last updated
2026-10-27
Current fill
98.0%vs 7 days ago
+0.7 ppgaining
vs 1 year ago
+29.9 ppyear-over-year
7-day trend
→stable
Drought context
Storage vs October average
138%of normal
98.0% full on 2026-10-27, against an average of 71.2% for October across 4 years of readings (+26.8 points).
Rain over the last three months · 11 October 2026
Near normal
In the three months to 11 October 2026 the area around Moora Moora Reservoir had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.24). Rain, not storage. Australia drought figures →
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-10-27.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.231°S, 142.426°E · Open in Google Maps
About Moora Moora Reservoir
As of October 27, 2026, Moora Moora Reservoir is filled to 98.0% of its total capacity, holding 6.17 hm³ of water out of a maximum 6.3 hm³. At this level the reservoir is high. Of that total, 5.3 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (+0.7 pp), and it is 29.9 points above its level on the same date a year earlier.
Across the readings we hold for Moora Moora Reservoir — 1096 data points between October 28, 2023 and October 27, 2026 — the level has ranged from a low of 0.0% (February 16, 2025) to a high of 101.7% (October 5, 2026). On average the reservoir is fullest around September and at its lowest around April.
The dam at Moora Moora Reservoir was completed in 1934. It is operated by BOM primarily for water supply. It lies within the Upper Glenelg River Basin basin at 37.231°S, 142.426°E.
Key facts
- Current fill level
- 98.0% of total capacity
- Water stored
- 6.17 hm³
- Total capacity
- 6.3 hm³
- Usable capacity
- 5.3 hm³
- 7-day change
- ▲ 0.7 pp
- Year-on-year
- ▲ 29.9 pp
- Primary use
- Water supply
- River
- Upper Glenelg River
- River basin
- Upper Glenelg River Basin
- Year completed
- 1934
- Operator
- BOM
- Coordinates
- 37.231°S, 142.426°E
- Last updated
- October 27, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 27 Oct 2026 | 98.0% | 6.17 |
| 26 Oct 2026 | 98.1% | 6.18 |
| 25 Oct 2026 | 97.9% | 6.17 |
| 24 Oct 2026 | 97.4% | 6.14 |
| 23 Oct 2026 | 97.5% | 6.14 |
| 22 Oct 2026 | 97.6% | 6.15 |
| 21 Oct 2026 | 97.5% | 6.14 |
| 20 Oct 2026 | 97.3% | 6.13 |
| 19 Oct 2026 | 97.7% | 6.15 |
| 18 Oct 2026 | 98.1% | 6.18 |
| 17 Oct 2026 | 98.4% | 6.2 |
| 16 Oct 2026 | 98.7% | 6.22 |

