Reservoir · New South Wales · Australia · BOM Water Data Online
Fitzroy Falls
93.9% full
Capacity
22.9 hm³
Volume stored
22 hm³
River
Yarrunga Creek
Year completed
1974
Coordinates
34.642°S, 150.498°E
Last updated
2026-09-08
Current fill
93.9%vs 7 days ago
-0.3%losing
vs 1 year ago
+4.7%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-09-08.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -34.642, 150.498 · Open in Google Maps
About Fitzroy Falls
As of September 8, 2026, Fitzroy Falls is filled to 93.9% of its total capacity, holding roughly 22 hm³ of water out of a maximum 23 hm³. At this level the reservoir is high. Of that total, about 10 hm³ is usable (live) storage.
Over the most recent week on record the fill level has held broadly steady (-0.3 pts), and it is 4.7 points above its level on the same date a year earlier.
Across the readings we hold for Fitzroy Falls — 1095 data points between September 10, 2023 and September 8, 2026 — the level has ranged from a low of 74.5% (March 27, 2025) to a high of 100.0% (May 23, 2025). On average the reservoir is fullest around July and at its lowest around December.
The dam at Fitzroy Falls was completed in 1974. It is operated by BOM primarily for water supply. It lies within the Yarrunga Creek Basin basin at 34.642°S, 150.498°E.
Key facts
- Current fill level
- 93.9%
- Water stored
- 22 hm³
- Total capacity
- 23 hm³
- Usable capacity
- 10 hm³
- 7-day change
- ▼ 0.3 pts
- Year-on-year
- ▲ 4.7 pts
- Primary use
- Water supply
- River
- Yarrunga Creek
- River basin
- Yarrunga Creek Basin
- Year completed
- 1974
- Operator
- BOM
- Coordinates
- 34.642°S, 150.498°E
- Last updated
- September 8, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 8 Sep 2026 | 93.9% | 22 |
| 7 Sep 2026 | 93.9% | 22 |
| 6 Sep 2026 | 93.9% | 22 |
| 5 Sep 2026 | 94.0% | 22 |
| 4 Sep 2026 | 94.1% | 22 |
| 3 Sep 2026 | 94.1% | 22 |
| 2 Sep 2026 | 94.2% | 22 |
| 1 Sep 2026 | 94.2% | 22 |
| 31 Aug 2026 | 94.3% | 22 |
| 30 Aug 2026 | 94.3% | 22 |
| 29 Aug 2026 | 94.2% | 22 |
| 28 Aug 2026 | 94.2% | 22 |