Reservoir · Victoria · Australia · BOM Water Data Online
Devilbend
50.2% full
Capacity
14.6 hm³
Volume stored
7 hm³
River
Off-stream
Year completed
1964
Coordinates
38.289°S, 145.105°E
Last updated
2026-06-09
Current fill
50.2%vs 7 days ago
0.0%stable
vs 1 year ago
+0.4%year-over-year
7-day trend
→stable
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-06-09.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. -38.289, 145.105 · Open in Google Maps
About Devilbend
As of June 9, 2026, Devilbend is filled to 50.2% of its total capacity, holding roughly 7 hm³ of water out of a maximum 15 hm³. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has held broadly steady (+0.0 pts), and it sits close to where it was a year earlier.
Across the readings we hold for Devilbend — 1065 data points between June 12, 2023 and June 9, 2026 — the level has ranged from a low of 49.6% (April 11, 2026) to a high of 63.2% (September 12, 2023). On average the reservoir is fullest around September and at its lowest around May.
The dam at Devilbend was completed in 1964. It is operated by BOM primarily for water supply. It lies within the Off-stream Basin basin at 38.289°S, 145.105°E.
Key facts
- Current fill level
- 50.2%
- Water stored
- 7 hm³
- Total capacity
- 15 hm³
- 7-day change
- No change
- Year-on-year
- ▲ 0.4 pts
- Primary use
- Water supply
- River
- Off-stream
- River basin
- Off-stream Basin
- Year completed
- 1964
- Operator
- BOM
- Coordinates
- 38.289°S, 145.105°E
- Last updated
- June 9, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 9 Jun 2026 | 50.2% | 7 |
| 8 Jun 2026 | 50.2% | 7 |
| 7 Jun 2026 | 50.2% | 7 |
| 6 Jun 2026 | 50.3% | 7 |
| 5 Jun 2026 | 50.3% | 7 |
| 4 Jun 2026 | 50.2% | 7 |
| 3 Jun 2026 | 50.2% | 7 |
| 2 Jun 2026 | 50.2% | 7 |
| 1 Jun 2026 | 50.1% | 7 |
| 31 May 2026 | 50.1% | 7 |
| 30 May 2026 | 50.1% | 7 |
| 29 May 2026 | 50.1% | 7 |
Frequently asked questions
What is the current water level of Devilbend?
As of June 9, 2026, Devilbend is at 50.2% of its capacity, holding approximately 7 hm³ of water, according to BOM data.
Is Devilbend reservoir full?
No. As of June 9, 2026, Devilbend is within its normal operating range at 50.2% of its capacity, so it is not full.
Is the water level at Devilbend rising or falling?
The level at Devilbend has been broadly stable over the latest week on record (0.0 points).
How much water can Devilbend hold?
Devilbend has a total capacity of 15 hm³.
Where is Devilbend reservoir located?
Devilbend is located in Victoria, Australia, within the Off-stream Basin basin (coordinates 38.289°S, 145.105°E).
When was Devilbend dam built?
The dam at Devilbend was completed in 1964.
What is Devilbend used for?
Devilbend is used primarily for water supply, and is managed by BOM.