← Australian Capital Territory

Reservoir · Australian Capital Territory · Australia · BOM Water Data Online

Corin

73.0% full

Capacity

70.9 hm³

Volume stored

52 hm³

River

Cotter River

Year completed

1968

Reported

November 9, 2026

Current fill

73.0%
Normal

vs 7 days ago

-1.4 pp

losing

vs 1 year ago

-18.9 pp

year-over-year

7-day trend

↓

falling

Drought context

Australia drought →

Storage vs November average

84%of normal

73.0% now · 86.8% average (4 yrs)

Rainfall, last 3 months

Near normal

SPI-3 −0.35 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
9 Nov 202673.0%51.76
8 Nov 202673.2%51.89
7 Nov 202673.4%52.01
6 Nov 202673.5%52.14
5 Nov 202673.7%52.24
4 Nov 202673.8%52.33
3 Nov 202674.1%52.51
2 Nov 202674.4%52.72
1 Nov 202674.7%52.95
31 Oct 202675.0%53.16
30 Oct 202675.3%53.39
29 Oct 202675.6%53.58

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Primary useWater supply
River basinCotter River Basin
Coordinates35.555°S, 148.831°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-09.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 35.555°S, 148.831°E · Open in Google Maps

About Corin

As of November 9, 2026, Corin is filled to 73.0% of its total capacity, holding 51.76 hm³ of water out of a maximum 70.9 hm³. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has fallen by 1.4 percentage points, and it is 18.9 points below its level on the same date a year earlier.

Across the readings we hold for Corin — 1095 data points between November 11, 2023 and November 9, 2026 — the level has ranged from a low of 57.2% (June 2, 2026) to a high of 100.0% (January 2, 2024). On average the reservoir is fullest around December and at its lowest around June.

The dam at Corin was completed in 1968. It is operated by BOM primarily for water supply. It lies within the Cotter River Basin basin at 35.555°S, 148.831°E.

Nearby reservoirs