← Tasmania

Reservoir · Tasmania · Australia · BOM Water Data Online

Cluny Lagoon

59.2% full

Capacity

4.9 hm³

Volume stored

3 hm³

River

Derwent River

Year completed

1967

Reported

November 11, 2026

Current fill

59.2%
Normal

vs 7 days ago

+0.1 pp

gaining

vs 1 year ago

+0.9 pp

year-over-year

7-day trend

→

stable

Drought context

Australia drought →

Storage vs November average

104%of normal

59.2% now · 56.9% average (4 yrs)

Rainfall, last 3 months

Severely dry

SPI-3 −1.51 · to 1 Nov 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
11 Nov 202659.2%2.9
10 Nov 202659.2%2.9
9 Nov 202659.1%2.9
8 Nov 202660.1%2.94
7 Nov 202658.7%2.88
6 Nov 202659.3%2.9
5 Nov 202659.4%2.91
4 Nov 202659.1%2.9
3 Nov 202659.1%2.9
2 Nov 202659.2%2.9
1 Nov 202659.8%2.93
31 Oct 202658.7%2.88

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Primary useWater supply
River basinDerwent River Basin
Coordinates42.512°S, 146.676°E

Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-11.

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 42.512°S, 146.676°E · Open in Google Maps

About Cluny Lagoon

As of November 11, 2026, Cluny Lagoon is filled to 59.2% of its total capacity, holding 2.9 hm³ of water out of a maximum 4.9 hm³. At this level the reservoir is within its normal operating range.

Over the most recent week on record the fill level has held broadly steady (+0.1 pp), and it sits close to where it was a year earlier.

Across the readings we hold for Cluny Lagoon — 1095 data points between November 13, 2023 and November 11, 2026 — the level has ranged from a low of 7.7% (December 6, 2023) to a high of 105.6% (September 2, 2024). On average the reservoir is fullest around September and at its lowest around February.

The dam at Cluny Lagoon was completed in 1967. It is operated by BOM primarily for water supply. It lies within the Derwent River Basin basin at 42.512°S, 146.676°E.

Nearby reservoirs