Reservoir · Tasmania · Australia · BOM Water Data Online
Cluny Lagoon
59.2% full
Capacity
4.9 hm³
Volume stored
3 hm³
River
Derwent River
Year completed
1967
Reported
November 11, 2026
Current fill
59.2%vs 7 days ago
+0.1 ppgaining
vs 1 year ago
+0.9 ppyear-over-year
7-day trend
→stable
Drought context
Australia drought →Storage vs November average
104%of normal
59.2% now · 56.9% average (4 yrs)
Rainfall, last 3 months
Severely dry
SPI-3 −1.51 · to 1 Nov 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 11 Nov 2026 | 59.2% | 2.9 |
| 10 Nov 2026 | 59.2% | 2.9 |
| 9 Nov 2026 | 59.1% | 2.9 |
| 8 Nov 2026 | 60.1% | 2.94 |
| 7 Nov 2026 | 58.7% | 2.88 |
| 6 Nov 2026 | 59.3% | 2.9 |
| 5 Nov 2026 | 59.4% | 2.91 |
| 4 Nov 2026 | 59.1% | 2.9 |
| 3 Nov 2026 | 59.1% | 2.9 |
| 2 Nov 2026 | 59.2% | 2.9 |
| 1 Nov 2026 | 59.8% | 2.93 |
| 31 Oct 2026 | 58.7% | 2.88 |
On the map
Zoom out for the other countries we track · click one to open itLoading map…
Technical specifications
| Primary use | Water supply |
| River basin | Derwent River Basin |
| Coordinates | 42.512°S, 146.676°E |
Data source: Bureau of Meteorology — Water Data Online (KiWIS) — daily mean storage volume, quality-controlled. Capacity from the BOM Water Storages ArcGIS layer (total design capacity in ML). Last reading: 2026-11-11.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 42.512°S, 146.676°E · Open in Google Maps
About Cluny Lagoon
As of November 11, 2026, Cluny Lagoon is filled to 59.2% of its total capacity, holding 2.9 hm³ of water out of a maximum 4.9 hm³. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has held broadly steady (+0.1 pp), and it sits close to where it was a year earlier.
Across the readings we hold for Cluny Lagoon — 1095 data points between November 13, 2023 and November 11, 2026 — the level has ranged from a low of 7.7% (December 6, 2023) to a high of 105.6% (September 2, 2024). On average the reservoir is fullest around September and at its lowest around February.
The dam at Cluny Lagoon was completed in 1967. It is operated by BOM primarily for water supply. It lies within the Derwent River Basin basin at 42.512°S, 146.676°E.

