← Zimbabwe
Normal18 November 2026

Tugwane Dam

Runde catchment · Irrigation

Storage

2.188 million m³

Net capacity

3.055 million m³

Report

18 November 2026

71.6%

Since 11 November 2026 the printed change is −1.2 percentage points. Since 29 April 2026 it is −28.4 percentage points.

Percent full

71.6%

Storage

2.188 Mm³

Net capacity

3.055 Mm³

Change since last report

−1.2 pp

Drought context

Zimbabwe drought →

Rainfall, last 3 months

N/A

No value on file

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Technical specifications

CatchmentRunde
PurposeIrrigation
OperatorZimbabwe National Water Authority (ZINWA)
Data source:Zimbabwe National Water Authority (ZINWA)·Last reading: 2026-11-18