← Zimbabwe
Low28 September 2026
Tokwane Dam
Runde catchment · Irrigation
Storage
3.742 million m³
Net capacity
14.454 million m³
Report
28 September 2026
25.9%
Since 21 September 2026 the printed change is +25.9 percentage points. Since 29 April 2026 it is −74.1 percentage points.
Percent full
25.9%Storage
3.742 Mm³Net capacity
14.454 Mm³Change since last report
+25.9 ppTechnical specifications
| Catchment | Runde |
| Purpose | Irrigation |
| Operator | Zimbabwe National Water Authority (ZINWA) |