← Zimbabwe
High18 November 2026

Mhende Dam

Runde catchment · Irrigation

Storage

3.642 million m³

Net capacity

3.642 million m³

Report

18 November 2026

100%

Since 11 November 2026 the printed change is 0 percentage points. Since 29 April 2026 it is 0 percentage points.

Percent full

100%

Storage

3.642 Mm³

Net capacity

3.642 Mm³

Change since last report

0 pp

Drought context

Zimbabwe drought →

Rainfall, last 3 months

N/A

No value on file

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Technical specifications

CatchmentRunde
PurposeIrrigation
OperatorZimbabwe National Water Authority (ZINWA)
Data source:Zimbabwe National Water Authority (ZINWA)·Last reading: 2026-11-18