← Zimbabwe
High28 September 2026
Mbindangombe Dam
Runde catchment · Irrigation
Storage
19.341 million m³
Net capacity
22.583 million m³
Report
28 September 2026
85.6%
Since 21 September 2026 the printed change is +0.5 percentage points. Since 29 April 2026 it is −14.4 percentage points.
Percent full
85.6%Storage
19.341 Mm³Net capacity
22.583 Mm³Change since last report
+0.5 ppTechnical specifications
| Catchment | Runde |
| Purpose | Irrigation |
| Operator | Zimbabwe National Water Authority (ZINWA) |