← Zimbabwe
Critical28 September 2026
Jumbo Dam
Mazowe catchment · Irrigation & Mining
Storage
0.532 million m³
Net capacity
20.951 million m³
Report
28 September 2026
2.5%
Since 21 September 2026 the printed change is −0.3 percentage points. Since 29 April 2026 it is −6.1 percentage points.
Percent full
2.5%Storage
0.532 Mm³Net capacity
20.951 Mm³Change since last report
−0.3 ppTechnical specifications
| Catchment | Mazowe |
| Purpose | Irrigation & Mining |
| Operator | Zimbabwe National Water Authority (ZINWA) |