← Zimbabwe
Normal28 September 2026
Antelope Dam
Mzingwane catchment · Irrigation & Water Supply
Storage
8.077 million m³
Net capacity
12.525 million m³
Report
28 September 2026
64.5%
Since 21 September 2026 the printed change is −1.4 percentage points. Since 29 April 2026 it is −35.5 percentage points.
Percent full
64.5%Storage
8.077 Mm³Net capacity
12.525 Mm³Change since last report
−1.4 ppTechnical specifications
| Catchment | Mzingwane |
| Purpose | Irrigation & Water Supply |
| Operator | Zimbabwe National Water Authority (ZINWA) |