← Zimbabwe
Normal18 November 2026

Antelope Dam

Mzingwane catchment · Irrigation & Water Supply

Storage

6.705 million m³

Net capacity

12.525 million m³

Report

18 November 2026

53.5%

Since 11 November 2026 the printed change is −1.3 percentage points. Since 29 April 2026 it is −46.5 percentage points.

Percent full

53.5%

Storage

6.705 Mm³

Net capacity

12.525 Mm³

Change since last report

−1.3 pp

Drought context

Zimbabwe drought →

Rainfall, last 3 months

N/A

No value on file

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Technical specifications

CatchmentMzingwane
PurposeIrrigation & Water Supply
OperatorZimbabwe National Water Authority (ZINWA)
Data source:Zimbabwe National Water Authority (ZINWA)·Last reading: 2026-11-18