Reservoir · Missouri · United States · USACE CWMS
Pomme de Terre Dam & Reservoir
65.2% full
Capacity
411.14 hm³
Volume stored
268 hm³
Coordinates
37.903°N, 93.318°W
Last updated
2026-09-14
Current fill
65.2%vs 7 days ago
-0.1%losing
vs 1 year ago
N/A7-day trend
→stable
Data source: USACE CWMS — US Army Corps of Engineers — daily reservoir storage volume. Design capacity is unavailable for this site, so fill % is estimated against the 5-year maximum storage and may overstate fullness. Last reading: 2026-09-14.
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.903, -93.318 · Open in Google Maps
About Pomme de Terre Dam & Reservoir
As of September 14, 2026, Pomme de Terre Dam & Reservoir is filled to 65.2% of its total capacity, holding roughly 268 hm³ of water out of a maximum 411 hm³. At this level the reservoir is within its normal operating range.
Over the most recent week on record the fill level has held broadly steady (-0.1 pts).
Across the readings we hold for Pomme de Terre Dam & Reservoir — 328 data points between September 15, 2021 and September 14, 2026 — the level has ranged from a low of 65.1% (September 9, 2026) to a high of 100.0% (June 27, 2026). On average the reservoir is fullest around June and at its lowest around September.
It is operated by USACE primarily for multiple purposes. It lies within the Missouri basin at 37.903°N, 93.318°W.
Key facts
- Current fill level
- 65.2%
- Water stored
- 268 hm³
- Total capacity
- 411 hm³
- 7-day change
- ▼ 0.1 pts
- Primary use
- Multipurpose
- River basin
- Missouri
- Operator
- USACE
- Coordinates
- 37.903°N, 93.318°W
- Last updated
- September 14, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 14 Sep 2026 | 65.2% | 268 |
| 13 Sep 2026 | 65.2% | 268 |
| 12 Sep 2026 | 65.3% | 268 |
| 11 Sep 2026 | 65.3% | 269 |
| 10 Sep 2026 | 65.4% | 269 |
| 9 Sep 2026 | 65.1% | 268 |
| 8 Sep 2026 | 65.2% | 268 |
| 7 Sep 2026 | 65.3% | 268 |
| 6 Sep 2026 | 65.3% | 269 |
| 5 Sep 2026 | 65.4% | 269 |
| 4 Sep 2026 | 65.5% | 269 |
| 3 Sep 2026 | 65.6% | 270 |

