← Thailand
HighHydroelectric

Vajiralongkorn

West

Capacity

8,860 hm³

Reported

November 13, 2026

96.2% full

Current fill

96.2%
High

vs 7 days ago

-0.2 pp

losing

vs 1 year ago

+5.4 pp

year-over-year

7-day trend

→

stable

Drought context

Thailand drought →

Rainfall, last 3 months

Very wet

SPI-3 +1.65 · to 21 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3).

Recent readings

DateFill levelVolume (hm³)
13 Nov 202696.2%8,522
12 Nov 202696.3%8,532
11 Nov 202696.4%8,545
10 Nov 202696.5%8,549
9 Nov 202696.6%8,556
6 Nov 202696.4%8,545
5 Nov 202696.5%8,549
4 Nov 202696.6%8,556
3 Nov 202696.6%8,560
2 Nov 202696.7%8,568
1 Nov 20260.0%0
31 Oct 202696.8%8,576

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

Technical specifications

Usable capacity5,848 hm³
OperatorElectricity Generating Authority of Thailand (EGAT)
Coordinates14.798°N, 98.593°E
Data source:Royal Irrigation Department (RID)·Last reading: 2026-11-13

About Vajiralongkorn

As of November 13, 2026, Vajiralongkorn is filled to 96.2% of its total capacity, holding 8,522 hm³ of water out of a maximum 8,860 hm³. At this level the reservoir is high. Of that total, 5,848 hm³ is usable (live) storage.

Over the most recent week on record the fill level has held broadly steady (-0.2 pp), and it is 5.4 points above its level on the same date a year earlier.

Across the readings we hold for Vajiralongkorn — 43 data points between October 25, 2025 and November 13, 2026 — the level has ranged from a low of 0.0% (November 1, 2026) to a high of 97.6% (October 21, 2026).

It is operated by Electricity Generating Authority of Thailand (EGAT) primarily for hydroelectric power. It is at 14.798°N, 98.593°E.

Nearby reservoirs