← Community of Madrid
NormalMulti-purpose

El Villar

Community of Madrid · Tajo

Capacity

23 hm³

Coordinates

40.971°N, 3.563°W

Operator

CHT

65.2% full

Current fill

65.2%
Normal

vs 13 Oct 2026

0.0 pp

stable

vs 1 year ago

-13.1 pp

year-over-year

Trend

→

stable

Drought context

Storage vs October average

99%of normal

65.2% full on 2026-10-19, against an average of 65.9% for October across 9 years of readings (-0.7 points).

Rain over the last three months · 11 October 2026

Near normal

In the three months to 11 October 2026 the area around Villar, El had rain close to normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index −0.62). Rain, not storage.

EU drought indicator · 11 October 2026

Warningsoil-moisture deficit

The European Drought Observatory's combined reading of rain, soil moisture and vegetation at this point. Watch means rain has been short, Warning that the soil has dried out, Alert that vegetation is visibly stressed; Recovery means the shortfall is easing. Ground conditions, not the reservoir's storage. Spain drought figures →

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity23 hm³
Primary useMulti-purpose
OperatorCHT
RegionCommunity of Madrid
River basinTajo
Data source:embalses.net·Last reading: 2026-10-19

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 40.971°N, 3.563°W · Open in Google Maps

About El Villar

As of October 19, 2026, El Villar is filled to 65.2% of its total capacity, holding 15 hm³ of water out of a maximum 23 hm³. At this level the reservoir is within its normal operating range.

Since October 13, 2026 the fill level has held broadly steady (+0.0 pp), and it is 13.1 points below its level on the same date a year earlier.

Across the readings we hold for El Villar — 419 data points between October 16, 2018 and October 19, 2026 — the level has ranged from a low of 47.8% (November 29, 2022) to a high of 100.0% (December 31, 2019). On average the reservoir is fullest around March and at its lowest around September.

It is operated by CHT primarily for multiple purposes. It lies within the Tajo basin at 40.971°N, 3.563°W.

Key facts

Current fill level
65.2% of total capacity
Water stored
15 hm³
Total capacity
23 hm³
Change since October 13, 2026
No change
Year-on-year
▼ 13.1 pp
Primary use
Multipurpose
River basin
Tajo
Operator
CHT
Coordinates
40.971°N, 3.563°W
Last updated
October 19, 2026

Recent readings

DateFill levelVolume (hm³)
19 Oct 202665.2%15
13 Oct 202665.2%15
6 Oct 202665.2%15
29 Sep 202665.2%15
22 Sep 202665.2%15
15 Sep 202665.2%15
8 Sep 202665.2%15
1 Sep 202665.2%15
25 Aug 202660.9%14
18 Aug 202669.6%16
11 Aug 202673.9%17
4 Aug 202682.6%19

Nearby reservoirs