← Spain
Low—

Vega del Jabalón

Guadiana

Capacity

34 hm³

Reported

November 2, 2026

35.3% full

Current fill

35.3%
Low

vs 27 Oct 2026

0.0 pp

stable

vs 1 year ago

+23.5 pp

year-over-year

Trend

→

stable

Drought context

Spain drought →

Storage vs November average

93%of normal

35.3% now · 38.0% average (9 yrs)

Rainfall, last 3 months

Near normal

SPI-3 −0.51 · to 11 Oct 2026

EU drought indicator

None

No drought signal · to 11 Oct 2026

Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity34 hm³
Primary use—
OperatorGuadiana
RiverJabalón Embalse aguas abajo: Cíjara Embalse aguas arriba: La Cabezuela Tipo de Presa: Gravedad y Materiales sueltos homogenea Año de construcción (Final): 1992 Superficie: 646,00 ha Localización: Ver Mapa
River basinGuadiana
Data source:embalses.net·Last reading: 2026-11-02

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 38.775°N, 3.763°W · Open in Google Maps

On the map

Zoom out for the other countries we track · click one to open it

Loading map…

About Vega del Jabalón

As of November 2, 2026, Vega del Jabalón is filled to 35.3% of its total capacity, holding 12 hm³ of water out of a maximum 34 hm³. At this level the reservoir is low.

Since October 27, 2026 the fill level has held broadly steady (+0.0 pp), and it is 23.5 points above its level on the same date a year earlier.

Across the readings we hold for Vega del Jabalón — 419 data points between October 30, 2018 and November 2, 2026 — the level has ranged from a low of 0.0% (July 6, 2021) to a high of 50.0% (February 17, 2026). On average the reservoir is fullest around April and at its lowest around January.

It is operated by Guadiana. It lies within the Guadiana basin at 38.775°N, 3.763°W.

Key facts

Current fill level
35.3% of total capacity
Water stored
12 hm³
Total capacity
34 hm³
Change since October 27, 2026
No change
Year-on-year
▲ 23.5 pp
River
Jabalón Embalse aguas abajo: Cíjara Embalse aguas arriba: La Cabezuela Tipo de Presa: Gravedad y Materiales sueltos homogenea Año de construcción (Final): 1992 Superficie: 646,00 ha Localización: Ver Mapa
River basin
Guadiana
Operator
Guadiana
Coordinates
38.775°N, 3.763°W
Last updated
November 2, 2026

Recent readings

DateFill levelVolume (hm³)
2 Nov 202635.3%12
27 Oct 202635.3%12
20 Oct 202635.3%12
13 Oct 202635.3%12
6 Oct 202635.3%12
29 Sep 202635.3%12
22 Sep 202635.3%12
15 Sep 202635.3%12
8 Sep 202635.3%12
1 Sep 202638.2%13
25 Aug 202638.2%13
18 Aug 202638.2%13

Nearby reservoirs