Torre del Águila
Sevilla · Andalusia · Guadalquivir
Capacity
48 hm³
Coordinates
37.044°N, 5.733°W
Operator
CHGu
31.3% full
Current fill
31.3%vs 7 days ago
-2.0%losing
vs 1 year ago
-45.8%year-over-year
7-day trend
↓falling
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 48 hm³ |
| Usable capacity | 43.2 hm³ |
| Primary use | Multi-purpose |
| Operator | CHGu |
| Province | Sevilla |
| Autonomous community | Andalusia |
| River basin | Guadalquivir |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.044, -5.733 · Open in Google Maps
About Torre del Águila
As of July 27, 2026, Torre del Águila is filled to 31.3% of its total capacity, holding roughly 15 hm³ of water out of a maximum 48 hm³. At this level the reservoir is low. Of that total, about 43 hm³ is usable (live) storage.
Over the most recent week on record the fill level has fallen by 2.0 percentage points, and it is 45.8 points below its level on the same date a year earlier.
Across the readings we hold for Torre del Águila — 420 data points between July 17, 2018 and July 27, 2026 — the level has ranged from a low of 2.1% (January 16, 2024) to a high of 100.0% (March 25, 2025). On average the reservoir is fullest around April and at its lowest around October.
It is operated by CHGu primarily for multiple purposes. It lies within the Guadalquivir basin at 37.044°N, 5.733°W.
Key facts
- Current fill level
- 31.3%
- Water stored
- 15 hm³
- Total capacity
- 48 hm³
- Usable capacity
- 43 hm³
- 7-day change
- ▼ 2.0 pts
- Year-on-year
- ▼ 45.8 pts
- Primary use
- Multipurpose
- River basin
- Guadalquivir
- Operator
- CHGu
- Coordinates
- 37.044°N, 5.733°W
- Last updated
- July 27, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 27 Jul 2026 | 31.3% | 15 |
| 20 Jul 2026 | 33.3% | 16 |
| 14 Jul 2026 | 35.4% | 17 |
| 7 Jul 2026 | 37.5% | 18 |
| 30 Jun 2026 | 39.6% | 19 |
| 23 Jun 2026 | 41.7% | 20 |
| 16 Jun 2026 | 43.8% | 21 |
| 9 Jun 2026 | 47.9% | 23 |
| 2 Jun 2026 | 54.2% | 26 |
| 26 May 2026 | 60.4% | 29 |
| 19 May 2026 | 64.6% | 31 |
| 12 May 2026 | 64.6% | 31 |
Frequently asked questions
What is the current water level of Torre del Águila?
As of July 27, 2026, Torre del Águila is at 31.3% of its capacity, holding approximately 15 hm³ of water, according to embalses.net data.
Is Torre del Águila reservoir full?
No. As of July 27, 2026, Torre del Águila is low at 31.3% of its capacity, so it is not full.
Is the water level at Torre del Águila rising or falling?
The level at Torre del Águila is falling — it dropped 2.0 percentage points over the latest week on record.
How much water can Torre del Águila hold?
Torre del Águila has a total capacity of 48 hm³, of which about 43 hm³ is usable storage.
Where is Torre del Águila reservoir located?
Torre del Águila is located in Sevilla, Andalusia, Spain, within the Guadalquivir basin (coordinates 37.044°N, 5.733°W).
What is Torre del Águila used for?
Torre del Águila is used primarily for multiple purposes, and is managed by CHGu.

