← Aragon
NormalMulti-purpose

Mequinenza

Zaragoza · Aragon · Ebro

Capacity

1,373 hm³

Coordinates

41.313°N, 0.056°E

Operator

CHE

55.9% full

Current fill

55.9%
Normal

vs 13 Oct 2026

-0.9 pp

losing

vs 1 year ago

+9.4 pp

year-over-year

Trend

→

stable

Drought context

Storage vs October average

88%of normal

55.9% full on 2026-10-19, against an average of 63.2% for October across 9 years of readings (-7.3 points).

Rain over the last three months · 11 October 2026

Moderately wet

In the three months to 11 October 2026 the area around Mequinenza had more rain than normal for the season. Rainfall compared with the long-run record for the same season at this point (Copernicus Global Drought Observatory, SPI-3 index +1.00). Rain, not storage.

EU drought indicator · 11 October 2026

Noneno drought signal

The European Drought Observatory's combined reading of rain, soil moisture and vegetation at this point. Watch means rain has been short, Warning that the soil has dried out, Alert that vegetation is visibly stressed; Recovery means the shortfall is easing. Ground conditions, not the reservoir's storage. Spain drought figures →

Catchment Weather

Past 30 days + 14-day forecast · Open-Meteo

Technical specifications

Total capacity1,373 hm³
Primary useMulti-purpose
OperatorCHE
ProvinceZaragoza
RegionAragon
River basinEbro
Data source:embalses.net·Last reading: 2026-10-19

Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 41.313°N, 0.056°E · Open in Google Maps

About Mequinenza

As of October 19, 2026, Mequinenza is filled to 55.9% of its total capacity, holding 767 hm³ of water out of a maximum 1,373 hm³. At this level the reservoir is within its normal operating range.

Since October 13, 2026 the fill level has held broadly steady (-0.9 pp), and it is 9.4 points above its level on the same date a year earlier.

Across the readings we hold for Mequinenza — 419 data points between October 16, 2018 and October 19, 2026 — the level has ranged from a low of 20.8% (November 8, 2022) to a high of 99.0% (March 18, 2025). On average the reservoir is fullest around February and at its lowest around October.

It is operated by CHE primarily for multiple purposes. It lies within the Ebro basin at 41.313°N, 0.056°E.

Key facts

Current fill level
55.9% of total capacity
Water stored
767 hm³
Total capacity
1,373 hm³
Change since October 13, 2026
▼ 0.9 pp
Year-on-year
▲ 9.4 pp
Primary use
Multipurpose
River basin
Ebro
Operator
CHE
Coordinates
41.313°N, 0.056°E
Last updated
October 19, 2026

Recent readings

DateFill levelVolume (hm³)
19 Oct 202655.9%767
13 Oct 202656.8%780
6 Oct 202657.5%789
29 Sep 202657.9%795
22 Sep 202659.1%812
15 Sep 202661.0%838
8 Sep 202663.0%865
1 Sep 202664.3%883
25 Aug 202666.0%906
18 Aug 202667.8%931
11 Aug 202670.9%973
4 Aug 202673.4%1,008

Nearby reservoirs