Crevillente
Alacant / Alicante · Valencian Community · Segura
Capacity
13 hm³
Coordinates
38.258°N, 0.792°W
Operator
CHG
61.5% full
Current fill
61.5%vs 7 days ago
+7.7%gaining
vs 1 year ago
0.0%year-over-year
7-day trend
↑rising
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 13 hm³ |
| Usable capacity | 11.7 hm³ |
| Primary use | Multi-purpose |
| Operator | CHG |
| Province | Alacant / Alicante |
| Autonomous community | Valencian Community |
| River basin | Segura |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 38.258, -0.792 · Open in Google Maps
About Crevillente
As of September 7, 2026, Crevillente is filled to 61.5% of its total capacity, holding roughly 8 hm³ of water out of a maximum 13 hm³. At this level the reservoir is within its normal operating range. Of that total, about 12 hm³ is usable (live) storage.
Over the most recent week on record the fill level has risen by 7.7 percentage points, and it sits close to where it was a year earlier.
Across the readings we hold for Crevillente — 419 data points between September 4, 2018 and September 7, 2026 — the level has ranged from a low of 15.4% (February 22, 2022) to a high of 76.9% (October 2, 2018). On average the reservoir is fullest around September and at its lowest around March.
It is operated by CHG primarily for multiple purposes. It lies within the Segura basin at 38.258°N, 0.792°W.
Key facts
- Current fill level
- 61.5%
- Water stored
- 8 hm³
- Total capacity
- 13 hm³
- Usable capacity
- 12 hm³
- 7-day change
- ▲ 7.7 pts
- Year-on-year
- No change
- Primary use
- Multipurpose
- River basin
- Segura
- Operator
- CHG
- Coordinates
- 38.258°N, 0.792°W
- Last updated
- September 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Sep 2026 | 61.5% | 8 |
| 1 Sep 2026 | 53.8% | 7 |
| 25 Aug 2026 | 53.8% | 7 |
| 18 Aug 2026 | 46.2% | 6 |
| 11 Aug 2026 | 53.8% | 7 |
| 4 Aug 2026 | 46.2% | 6 |
| 28 Jul 2026 | 46.2% | 6 |
| 21 Jul 2026 | 53.8% | 7 |
| 14 Jul 2026 | 53.8% | 7 |
| 7 Jul 2026 | 61.5% | 8 |
| 30 Jun 2026 | 61.5% | 8 |
| 23 Jun 2026 | 69.2% | 9 |

