Colomera
Granada · Andalusia · Guadalquivir
Capacity
40 hm³
Coordinates
37.405°N, 3.722°W
Operator
CHGu
80.0% full
Current fill
80.0%vs 7 days ago
-2.5%losing
vs 1 year ago
+70.0%year-over-year
7-day trend
↓falling
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 40 hm³ |
| Usable capacity | 36 hm³ |
| Primary use | Multi-purpose |
| Operator | CHGu |
| Province | Granada |
| Autonomous community | Andalusia |
| River basin | Guadalquivir |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.405, -3.722 · Open in Google Maps
About Colomera
As of September 7, 2026, Colomera is filled to 80.0% of its total capacity, holding roughly 32 hm³ of water out of a maximum 40 hm³. At this level the reservoir is high. Of that total, about 36 hm³ is usable (live) storage.
Over the most recent week on record the fill level has fallen by 2.5 percentage points, and it is 70.0 points above its level on the same date a year earlier.
Across the readings we hold for Colomera — 419 data points between September 4, 2018 and September 7, 2026 — the level has ranged from a low of 7.5% (September 13, 2022) to a high of 100.0% (February 24, 2026). On average the reservoir is fullest around June and at its lowest around November.
It is operated by CHGu primarily for multiple purposes. It lies within the Guadalquivir basin at 37.405°N, 3.722°W.
Key facts
- Current fill level
- 80.0%
- Water stored
- 32 hm³
- Total capacity
- 40 hm³
- Usable capacity
- 36 hm³
- 7-day change
- ▼ 2.5 pts
- Year-on-year
- ▲ 70.0 pts
- Primary use
- Multipurpose
- River basin
- Guadalquivir
- Operator
- CHGu
- Coordinates
- 37.405°N, 3.722°W
- Last updated
- September 7, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 7 Sep 2026 | 80.0% | 32 |
| 1 Sep 2026 | 82.5% | 33 |
| 25 Aug 2026 | 85.0% | 34 |
| 18 Aug 2026 | 87.5% | 35 |
| 11 Aug 2026 | 87.5% | 35 |
| 4 Aug 2026 | 90.0% | 36 |
| 28 Jul 2026 | 92.5% | 37 |
| 21 Jul 2026 | 95.0% | 38 |
| 14 Jul 2026 | 97.5% | 39 |
| 7 Jul 2026 | 97.5% | 39 |
| 30 Jun 2026 | 100.0% | 40 |
| 23 Jun 2026 | 100.0% | 40 |

