La Breña II
Córdoba · Andalusia · Guadalquivir
Capacity
823 hm³
Reported
November 2, 2026
76.6% full
Current fill
76.6%vs 27 Oct 2026
+0.1 ppgaining
vs 1 year ago
+40.3 ppyear-over-year
Trend
→stable
Drought context
Spain drought →Storage vs November average
175%of normal
76.6% now · 43.7% average (9 yrs)
Rainfall, last 3 months
Moderately dry
SPI-3 −1.26 · to 11 Oct 2026
EU drought indicator
Watch
Rainfall deficit · to 11 Oct 2026
Drought figures describe the ground around the reservoir, not its storage. Sources: Copernicus GDO (SPI-3) · Copernicus EDO (CDI).
Catchment Weather
Past 30 days + 14-day forecast · Open-Meteo
Technical specifications
| Total capacity | 823 hm³ |
| Primary use | Multi-purpose |
| Operator | CHGu |
| River | Guadiato Embalse aguas abajo: No Embalse aguas arriba: Puente Nuevo Tipo de Presa: Gravedad Año de construcción (Final): 2009 Superficie: 1.974,90 ha Localización: Ver Mapa |
| Province | Córdoba |
| Region | Andalusia |
| River basin | Guadalquivir |
Satellite imagery: Esri, Maxar, Earthstar Geographics. Map: Esri, HERE, Garmin, © OpenStreetMap contributors. 37.851°N, 5.046°W · Open in Google Maps
On the map
Zoom out for the other countries we track · click one to open itLoading map…
About La Breña II
As of November 2, 2026, La Breña II is filled to 76.6% of its total capacity, holding 630 hm³ of water out of a maximum 823 hm³. At this level the reservoir is within its normal operating range.
Since October 27, 2026 the fill level has held broadly steady (+0.1 pp), and it is 40.3 points above its level on the same date a year earlier.
Across the readings we hold for La Breña II — 419 data points between October 30, 2018 and November 2, 2026 — the level has ranged from a low of 9.7% (November 8, 2022) to a high of 83.2% (June 9, 2026). On average the reservoir is fullest around April and at its lowest around November.
It is operated by CHGu primarily for multiple purposes. It lies within the Guadalquivir basin at 37.851°N, 5.046°W.
Key facts
- Current fill level
- 76.6% of total capacity
- Water stored
- 630 hm³
- Total capacity
- 823 hm³
- Change since October 27, 2026
- ▲ 0.1 pp
- Year-on-year
- ▲ 40.3 pp
- Primary use
- Multipurpose
- River
- Guadiato Embalse aguas abajo: No Embalse aguas arriba: Puente Nuevo Tipo de Presa: Gravedad Año de construcción (Final): 2009 Superficie: 1.974,90 ha Localización: Ver Mapa
- River basin
- Guadalquivir
- Operator
- CHGu
- Coordinates
- 37.851°N, 5.046°W
- Last updated
- November 2, 2026
Recent readings
| Date | Fill level | Volume (hm³) |
|---|---|---|
| 2 Nov 2026 | 76.6% | 630 |
| 27 Oct 2026 | 76.5% | 630 |
| 20 Oct 2026 | 76.5% | 630 |
| 13 Oct 2026 | 76.4% | 629 |
| 6 Oct 2026 | 76.2% | 627 |
| 29 Sep 2026 | 76.3% | 628 |
| 22 Sep 2026 | 76.3% | 628 |
| 15 Sep 2026 | 76.5% | 630 |
| 8 Sep 2026 | 76.9% | 633 |
| 1 Sep 2026 | 77.0% | 634 |
| 25 Aug 2026 | 77.5% | 638 |
| 18 Aug 2026 | 78.1% | 643 |

